I think they should fight to the death. And by "fight to the death" I mean have a pointless debate about something like "snippiness" being misspelled in some thread on another forum.I think they both can co-exist
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I think they should fight to the death. And by "fight to the death" I mean have a pointless debate about something like "snippiness" being misspelled in some thread on another forum.I think they both can co-exist
I think they should fight to the death. And by "fight to the death" I mean have a pointless debate about something like "snippiness" being misspelled in some thread on another forum.
Position is unknown at present. Photo obtained 3rd hand but only information received was "on NJ Turnpike"
Do you have a link to the thread at teslamotors.com?
Do you have a link to the thread at teslamotors.com?
- - - Updated - - -
Actually, pretty sure that picture is from Milford:
Tesla Supercharger - Milford, CT southbound - Google Maps
Looks similar but I'm not sure they are the same.
See here:
http://www.teslamotorsclub.com/showthread.php/11734-East-Coast-Supercharging-network/page7
Later today I plan to drive past the Molly Pitcher Rest area in NJ.
I will stop in and scout out the area looking for any signs of construction.
Today I stopped at both the Molly Pitcher rest area (around exit 8a Southbound) and Richard Stockton rest area (around exit 7a Southbound.) Both area's I saw NO evidence of any construction that looked like it would be SC related.
At the Molly Pitcher rest area, there were 3 pre-formed concrete pads (my uneducated guess) at the very southern part of the truck parking area. One was approximately 4'x4', one 4'x6' and the last 4'x8'. They all had metal pieces sticking out about 2". They were not installed but laying on the grass/dirt. Again, I didn't look SC related to me.
Note, that area for many miles has major construction, adding a whole 3 lane highway in each direction as well as replacing dozens (it might be close to 100) overpass bridges.
Here is a picture of the medium one.
View attachment 22603
I'm almost certain the picture is from the southbound Milford supercharger. It matches the Google Maps image perfectly.
I've confirmed the location of the Santa Barbara area charger. It will be at the Marriott Hotel in Buellton, CA. There will be 8 chargers.
Source: https://aca.sbcountyplanning.org/CitizenAccess/ Permit 13ELE-00000-00137
Can the map admin delete the Santa Barbara pin?
I5 damn it, get it hooked up! It's great that southern California is all linked, but I can't get there from the Pacific Northwest.
Thank you for confirming this one. I previously reported here that I spoke to a Tesla worker at a Supercharger site a week ago, and he told me they would be installing them in Buellton, Atascadero, Oxnard, and San Juan Capistrano. It was pointed out that these are only 80 miles apart, but your post helps to confirm he was correct. To me, this now casts suspicion on the Paso Robles Inn rumored location, as it is very close to Atascadero.