bijan
Member
It's basic math, if charge rate in km/h is the same before and after then it will take longer to charge to 525km vs 499km. If it's just a software fix then it should take the same amount of time to charge, and thus the km/h charge rate should be higher.I see no reason charge rate would matter. If they change the efficiency of the car via software there would be no impact to the battery.
The same efficiency software change that says 75kWh = 525km instead of 75kWh = 499km would make 7.5kw charge rate = 52.5km/h after vs 49.9km/h before (525/(75kWh/7.5kW)) vs (499/(75kWh/7.5))