can anyone report / give updates on the behavior of their system when set to export everything and time based ? have they "learned"
searched forum and keep landing on this thread
I was on export solar only .. just noticed option to export everything tried it yesterday and right at 4pm (i have peak 4-9pm only all other times off peak ) discharged both power walls at their max plus excess solar and went from 100% to 20% reserve by ~ 6pm then had to run off peak grid import till 9pm ..i assume this is the systems 1st "uneducated" attempt to cover peak and export max so wondering what ppl saw/ see what sort of timeline should i expect while learning if any
searched forum and keep landing on this thread
I was on export solar only .. just noticed option to export everything tried it yesterday and right at 4pm (i have peak 4-9pm only all other times off peak ) discharged both power walls at their max plus excess solar and went from 100% to 20% reserve by ~ 6pm then had to run off peak grid import till 9pm ..i assume this is the systems 1st "uneducated" attempt to cover peak and export max so wondering what ppl saw/ see what sort of timeline should i expect while learning if any