05/01/19: ordered a 4kw system and PW.
05/08/19: home assessment was completed.
05/20/19: 1st proposal sent
05/23/19: final proposal sent/contract signed
05/23/19: was told plans were submitted to Utility(SRP)
05/30/19: turns our plans weren’t submitted, received zero one(L1) designs. Friend noticed Tesla incorrectly was installing meters inside garage and not outside.
05/31/19: new designs were corrected, meters outside now but Tesla decided to double my system to 8kw instead of 4kw. Designs sent back to team and now we wait.
Slightly concerned that every time I talk to designs they further mess up and that utility will reject designs. Has it been pretty smooth for everyone recently or lots of bumps? Lol
05/08/19: home assessment was completed.
05/20/19: 1st proposal sent
05/23/19: final proposal sent/contract signed
05/23/19: was told plans were submitted to Utility(SRP)
05/30/19: turns our plans weren’t submitted, received zero one(L1) designs. Friend noticed Tesla incorrectly was installing meters inside garage and not outside.
05/31/19: new designs were corrected, meters outside now but Tesla decided to double my system to 8kw instead of 4kw. Designs sent back to team and now we wait.
Slightly concerned that every time I talk to designs they further mess up and that utility will reject designs. Has it been pretty smooth for everyone recently or lots of bumps? Lol