https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024002170
Scope of Work: New EV charging Station
Owner Name: Tesla Inc.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Scope of Work: New EV charging Station
Owner Name: Tesla Inc.
Exactly why I’m excited. Having to overcharge in Fort Stockton was always a pain too.This makes trips from Midland to Marfa way easier. I’m excited about it.
Generally from this point in construction it takes longer than that. Very much depends on transformer availability and the local power company.We’re headed to Big Bend in two weeks.
Hopefully it’s online by then!
Generally from this point in construction it takes longer than that. Very much depends on transformer availability and the local power company.
Any suggestion are appreciated.