Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Beltsville, MD

This site may earn commission on affiliate links.
Waiting on concrete, the guys are standing there waiting for the concrete truck .
 

Attachments

  • 1C85957E-C084-4A5A-A15E-1202D1787C7E.jpeg
    1C85957E-C084-4A5A-A15E-1202D1787C7E.jpeg
    710.6 KB · Views: 153
  • 78CC6CCE-85AD-426D-8FF8-CF6B06CEEFCE.jpeg
    78CC6CCE-85AD-426D-8FF8-CF6B06CEEFCE.jpeg
    747.4 KB · Views: 101
Are they just pouring concrete for the EVgo pads?
Pipe bollards,SC main cabinets, electrical pad. I wasn’t looking for the transformer pad which would be precast. The pads were in the forefront of my picture. The charging pedestals are the standard precast.

The poles (Bollards) are up and the precast is done so the underground should now be done.
 
So the fencing is all down here except for a small corner where there's still some leftover stuff (large spools of wiring, some crates). Other than that corner, everything is cleaned up and looks ready to go. I'm sure there must still be some electrical work to do, as well as inspections, of course.

The new thing I noticed was that there are actually four EVgo stalls now since I posted the picture above. So they've increased the number of Tesla stalls from 8 to 12 and doubled the number of EVgo stalls from what the initial permit said. The other two EVgo stalls are to the left of the two cabinets in the picture in the previous post.
 
Last edited:
Here are some more pictures (close ups of the "Delta" chargers!):
 

Attachments

  • B9DFCDAE-35A7-425D-A58C-F82408CD01CA.jpeg
    B9DFCDAE-35A7-425D-A58C-F82408CD01CA.jpeg
    592.2 KB · Views: 89
  • 2253A146-3E22-440B-A052-DD8F267BB32E.jpeg
    2253A146-3E22-440B-A052-DD8F267BB32E.jpeg
    609.2 KB · Views: 82
  • D46BB171-78F0-4889-9FA7-62F0C37E3ADB.jpeg
    D46BB171-78F0-4889-9FA7-62F0C37E3ADB.jpeg
    691.1 KB · Views: 81
  • E3C6E19F-9E0D-4741-BEC7-E88292AC8DF8.jpeg
    E3C6E19F-9E0D-4741-BEC7-E88292AC8DF8.jpeg
    494.4 KB · Views: 84
  • F9993565-C053-4F5B-81B9-BCA0F7DBA791.jpeg
    F9993565-C053-4F5B-81B9-BCA0F7DBA791.jpeg
    507.8 KB · Views: 65
  • 41D6306B-7F89-4CEB-AC8B-A605653E71BA.jpeg
    41D6306B-7F89-4CEB-AC8B-A605653E71BA.jpeg
    727 KB · Views: 82
  • 112B8028-EEA6-4C98-A61A-D0ADBBCEAD69.jpeg
    112B8028-EEA6-4C98-A61A-D0ADBBCEAD69.jpeg
    709.8 KB · Views: 75
I’m glad to see this charger is making progress! Having More superchargers along this side of the Beltway is always welcome, especially with all of the East Coast traffic that it gets (I-95 runs on this side of the Beltway, so there’s always people traveling through there).

The Royal Farms off Ritchie-Marlboro Road (Exit 13) would be another good site, but that area can get pretty crazy with traffic sometimes. The Wawa across the beltway gets overcrowded and there’s really no room to build a supercharger on that site.
 
  • Like
Reactions: PStewart