As Promised, here are photos I took this morning.
The first two photos show where it was thought the 11 pedals would go. As you can see this is now unlikely. The land that was beyond the parking lot pavement was removed. The grade was lowered to add more parking to the hotel lot level. there is now a steep sloping bank right up to the edge of the existing lot.
The new parking lot expansion added a 7 vehicle space here and what appears to be a new drive-thru or pull around lane behind it.
The Concrete pad area in the background make me Speculate the SuC pedestals may go here.
I’m only guessing at this point. Time will tell.
The first two photos show where it was thought the 11 pedals would go. As you can see this is now unlikely. The land that was beyond the parking lot pavement was removed. The grade was lowered to add more parking to the hotel lot level. there is now a steep sloping bank right up to the edge of the existing lot.
The new parking lot expansion added a 7 vehicle space here and what appears to be a new drive-thru or pull around lane behind it.
The Concrete pad area in the background make me Speculate the SuC pedestals may go here.
I’m only guessing at this point. Time will tell.