Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Boulder, CO

This site may earn commission on affiliate links.
F2AD4317-20B3-49ED-A928-91FBC36327BF.jpeg
Here’s the approximate location of the perimeter fencing I photographed this morning.
 
The Trader Joe’s parking lot can get really crowded so I would predict some ICEing, but on the positive side, it’s a very convenient spot with many good coffee, food and shopping options within walking distance. It also has one of the better views of the flatirons and mountains.
 
More pics of construction site from this morning (2018-04-01 around 1000). It looks like a section of the lot is dug up and there's also a spot where a curb has been removed.

It's immediately next to Vitamin Shoppe between that and Trader Joe's. A lot easier to access than I expected but I share the same concern about parking here at busy times. Hope they plan on signing and enforcing charging here.

IMG_20180401_093559.jpg
IMG_20180401_093917.jpg
 
  • Like
Reactions: ThisIsTrue
I also went by this evening and took more photos, sorry for the overlap.
 

Attachments

  • 3088D067-C8D8-4C3E-A0AE-DE4FC686BBEC.jpeg
    3088D067-C8D8-4C3E-A0AE-DE4FC686BBEC.jpeg
    628.6 KB · Views: 211
  • BD964BC8-59C5-45BD-AD24-0393A13BCDFC.jpeg
    BD964BC8-59C5-45BD-AD24-0393A13BCDFC.jpeg
    484.8 KB · Views: 203
  • A3654DB2-C231-424F-815E-70E65B9CA754.jpeg
    A3654DB2-C231-424F-815E-70E65B9CA754.jpeg
    590.8 KB · Views: 217
  • 139FEE21-6117-458C-ADE6-CF41DFB921CA.jpeg
    139FEE21-6117-458C-ADE6-CF41DFB921CA.jpeg
    783.4 KB · Views: 211
  • A61F6991-9DAF-411A-805F-6820C11FF2A0.jpeg
    A61F6991-9DAF-411A-805F-6820C11FF2A0.jpeg
    1.1 MB · Views: 206
  • FD7FAC73-4A11-45A9-BDA9-AEC3CC62260D.jpeg
    FD7FAC73-4A11-45A9-BDA9-AEC3CC62260D.jpeg
    725.4 KB · Views: 205
  • D0CD4F51-8277-44AF-8291-5D95755B5C63.jpeg
    D0CD4F51-8277-44AF-8291-5D95755B5C63.jpeg
    878.1 KB · Views: 205
  • D8A8F978-0137-4F05-891E-4923BAE5488B.jpeg
    D8A8F978-0137-4F05-891E-4923BAE5488B.jpeg
    659.2 KB · Views: 202
  • 8719E0D5-5DB9-42CB-AA84-865853C14AC6.jpeg
    8719E0D5-5DB9-42CB-AA84-865853C14AC6.jpeg
    1.1 MB · Views: 214
Weekend Update, can’t tell if these are 120KW or 72KW Superchargers. No one working but it is Sunday AM.
 

Attachments

  • F117792B-BC39-4480-8FAC-92E4BEF51E39.jpeg
    F117792B-BC39-4480-8FAC-92E4BEF51E39.jpeg
    754.9 KB · Views: 154
  • 15957F89-21B0-45B2-8D03-38B16070ADFD.jpeg
    15957F89-21B0-45B2-8D03-38B16070ADFD.jpeg
    525.6 KB · Views: 161
  • C8FA38EE-D57B-488D-8DA6-00D9A7F69056.jpeg
    C8FA38EE-D57B-488D-8DA6-00D9A7F69056.jpeg
    486.3 KB · Views: 160
  • 6CC3AC77-6462-4CFC-AE7F-842F5D4719CB.jpeg
    6CC3AC77-6462-4CFC-AE7F-842F5D4719CB.jpeg
    591 KB · Views: 159
  • D7C13A77-CA3B-44EF-9FE8-3BD28ABB9D16.jpeg
    D7C13A77-CA3B-44EF-9FE8-3BD28ABB9D16.jpeg
    585.8 KB · Views: 167
I stopped by today and it looks about the same as in your photos.. Seems like they are working on the conduit between the different parts and moving dirt still.

I am surprised that the Supercharge Cabs (the white boxes?) are so far away from what looks like the Utility stuff (the big dark grey one). I am thinking the actual stalls will be inbetween them. Also no transformer is present yet, but it seems like that won't happen till the project is almost done.
 

Attachments

  • IMG_3008.jpg
    IMG_3008.jpg
    769.8 KB · Views: 133
  • Informative
Reactions: HillCountryFun
E43988AD-551F-4F28-A684-CF4A7334CFDA.jpeg
Spoke with the contractor today. He said that there will be 10 stalls. And he estimated that the chargers will be fully complete and available to charge in 5-6 weeks. I took a few more photos showing similar progress to that captured by evp yesterday. Exciting!!
 

Attachments

  • E51AE002-3792-4B20-9EBE-A7E2A2F284F7.jpeg
    E51AE002-3792-4B20-9EBE-A7E2A2F284F7.jpeg
    606.8 KB · Views: 86
  • 2D7F8539-73EB-482E-B669-792ECF344A5F.jpeg
    2D7F8539-73EB-482E-B669-792ECF344A5F.jpeg
    623.2 KB · Views: 92
View attachment 299093 Spoke with the contractor today. He said that there will be 10 stalls.
That's interesting. There didn't seem to be that much room in the two rows they've worked on so far -- the power cabinets and transformer looked like they were sucking up more space than the original design. But the "before" picture from Google maps clearly shows 4 stalls in one row and 6 in the other. Guess I'll have to go take another look.
 
That's interesting. There didn't seem to be that much room in the two rows they've worked on so far -- the power cabinets and transformer looked like they were sucking up more space than the original design. But the "before" picture from Google maps clearly shows 4 stalls in one row and 6 in the other. Guess I'll have to go take another look.
According to the contractor, two of the ten stalls will be along the eastern side, not in the same rows as the others. So, I guess for the northeastern-most spot, you will have to nose in. None of the spots will be pull through, so not ideal for those traveling with trailers.