pdeinselen
Member
Just stopped by at lunch and it looks to be about the same as from last week.
I agree that this location is going to be heavily "iced", especially during the lunch hour as Chic-fil-a seems to be under parked and there are limited ingress/egress points. At the same time, it's nice to see a SC location in mid-Pinellas county along US 19.
Thanks for the update. Saves me the time tomorrow as I won't stop unless I see the Tesla crates have been delivered.
The good thing is Wawa is not a location you stop and stay long, so even if ICEd I would expect the owner of the car to return in about 10 minutes. Also since these should be v3 cabinets they will have dedicated power as well as peak 250kW rates which will help minimize the time of vehicles needing to charge.
I am also not sure how popular this location will be in terms of those needing to charge due to a road trip. Anyone in South Pinellas (Largo, Seminole, Saint Pete) that is heading North (Ocala, Lake City, out of the state) will head East to 275 and then North on I-75. I feel these are just to supplement the future needs of EV stations. I would love to be in the Tesla planning sessions where this type of decisions are to be made. I know I predicted this location in March of 2018, Anyone wondering about the 21 "Coming Soon" Supercharger Stations in Florida?, however that was only because it was the logical location for the "coming soon Clear Water" [sic] location.