No change, stopped by just the other day. I also talked to a Tesla Supercharger maintenance guy I bumped into in Iowa. Interesting conversation. Some things of interest:
1) Nobody, as far as he knows, knows the status of any of the "in progress" installations, and maintenance can't do shite about them. Apparently these was no turnover of status or next steps of any of the "in progress" installs. This means even if it's "done" nobody knows contractual status or legal viability to operate the darn things.
2) His take was the some of the expansion team were great, but some were tools too, and things had gotten crazy slow and political in that team. He seemed to think starting over wasn't entirely bad.
3) He was clear there was NO inpact to the maintenance team. Meaning repair of existing is unaffected.
So when will it the EP SC site come online? Dunno. The site looks physically complete.