They're effectively waiting for Ameren to run the high voltage lines to the site and to place the main transformer.
In Road Tripper's photos, the main switching equipment is on the left, but the extended cabinet in front is for information exchange. The smaller cabinet on the left of the front cabinets is for controlling the 4 level 2 J1772 chargers that are going in.