Great pics with VERY INFORMATIVE descriptions of each. Thank you!!One of our club members (aka ejp001) continues to provide excellent photos of the construction progress.
I have updated our article to add them. Scroll down to the bottom of the article for current status and photos.
Confirmed the location of the “Coming Soon” Gainesville Supercharger Station will be at Butler Plaza (Public)
Larry
With all due respect, you apparently aren't looking in the right place to view daily progress.There seems to be little if any activity this week.. I pass by twice a day to and from work. No works have been there this week and no progress noticed. Guess they are on Spring Break
This past week I've been by the location twice daily, around mid-day having lunch at Whole foods and the workers trucks have not even been there. Again on way home later same day 11p and no changes. Perhaps they were there yesterday or today as I didn't go by but I know for fact they were not actively working at the side Mon-Wed.With all due respect, you apparently aren't looking in the right place to view daily progress.
Today we have a photo that shows that the high-voltage switchgear has been installed across the street from the charging terminals.
I have updated our article. Scroll down to the bottom of the article for current status and photos.
Confirmed the location of the “Coming Soon” Gainesville Supercharger Station will be at Butler Plaza (Public)
Larry
Since you posted your comment yesterday, I assumed that you were there yesterday. Thanks for the clarification and for your continued vigilence. If you have the time please take some day time photos. Since your last visit there has been definite progress. I suspect that the Tesla contractor will be installing the Supercharger Cabinets next and pulling cables from them to the charging terminals.This past week I've been by the location twice daily, around mid-day having lunch at Whole foods and the workers trucks have not even been there. Again on way home later same day 11p and no changes. Perhaps they were there yesterday or today as I didn't go by but I know for fact they were not actively working at the side Mon-Wed.
Welcome to the forums. Yes, hopefully the waiting will soon be over.I cant believe theres been a thread on this location for over 5 years! Looks like its almost done though which is good because the Ocala charger is back tracking a little for me coming across SR40
They sound like great peopleWent by again today, Sunday 31 March, it's clearly almost done. The stalls all in and the transformer things on the other side of the road in place, I think, but not wired up yet. Just a word of advice- the guys working there are sick and tired of these Tesla people coming by and asking when the chargers will be ready- what with the local permitting and whatever is going on in Elon's brain they simply don't know, so if you ask you are just wasting their time.
I was just in Gainesville and a search of the Google Maps app came up with the location. Even though the Tesla did not show it on the map we did a drive by. The station appears to be complete except the lights aren't on and there is a construction fence around it. Looks like is is coming VERY SOON!Maybe it's old news and I missed it, but great news anyway!
Supercharger | Tesla Motors
Moderators Note June 18, 2018:
Changed title to "Confirmed the location of the “Coming Soon” Gainesville Supercharger Station will be at Butler Plaza".
Larry
Thanks Del,I was just in Gainesville and a search of the Google Maps app came up with the location. Even though the Tesla did not show it on the map we did a drive by. The station appears to be complete except the lights aren't on and there is a construction fence around it. Looks like is is coming VERY SOON!
Thanks for the update. I certainly hope snow is not an issue.View attachment 394126 2:17pm update:
Engineers are hard at work engineering transformer connections.
Engineers upgraded and now have a tent to allow them to work and be protected by the environmental elements eg. snow, rain, and sun.
New ant pile forming on supercharger 3. Will keep everyone updated. Hope this is helpful.