Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Greenfield, WI

This site may earn commission on affiliate links.
Usually, they mount them on a Stand-alone cabinet near the Transformer. Like Waukesha or Lake Delton. It seems like there is no set standardization though. I’ve seen them on White,Silver and Green switch cabinets along with 2-post mount boards.

Waukesha, meter box was mounted on its Green cabinet back in December. Five months before the transformer showed up.
 
Photos or it didn’t happen 😂.
It happened.
But not done yet. Need Tesla power up, testing, more dirt (landscaping) and parking lines.
 

Attachments

  • 20230811_141143.jpg
    20230811_141143.jpg
    631.7 KB · Views: 100
  • 20230811_141222.jpg
    20230811_141222.jpg
    774.7 KB · Views: 58
Even if they installed the meter, would Tesla keep it offline and fenced off until the landscaping is done?
Hard to say. The Lake Delton site was open before the finish landscaping was completed (leveling and reseeding grass).

The installation contractor usually Subs out Landscaping and any ongoing maintenance locally,if required. Things like watering any trees or shrubs until they are fully established. If it’s just minimal stuff that doesn’t need any ongoing maintenance, they typically do that themselves.