Nope. Tesla has said that they have three ways to meet the 150kW requirement of NEVI:Probably designed to output to only 2 posts for NEVI compatibility (150kw/stall no sharing). And maybe some type of 800V compatibility built in. We won’t know until we see the data plate and site design.
- Put fewer than 4 posts per cabinet.
- Add extra cabinets.
- Use software to enforce requirements.
Tesla says that they have confirmation that 800v support isn't required.
It sounds like the same plan here. We just don't know how many posts would be NEVI funded. (Is this site even NEVI funded?)