It feels like this last part is taking an awful long time. I understand they are probably waiting on final inspections and such... but it is taking forever!They’ve filled in the big hole around that concrete base near Centennial Center Blvd (scroll up for picks I’ve taken of that). Still no transformer BUT the trash can was installed so… WINNING!
View attachment 826359
View attachment 826362View attachment 826363View attachment 826364
I drove by over the weekend and there did not appear to be any progress since the last photos were posted in this thread. I didn't bother pulling into the lot to check things out, but it looked like there was still a lot of cleanup work left to be done. Sorry...Any info on when this will open? I need it on Friday.
Thanks for the info! I will have to try and go from Mesquite to Beatty.I drove by over the weekend and there did not appear to be any progress since the last photos were posted in this thread. I didn't bother pulling into the lot to check things out, but it looked like there was still a lot of cleanup work left to be done. Sorry...
Be careful on that one. It's uphill and often into the wind. The elevation alone will burn ~18 rated miles. Try to charge up to 300 rated miles if you can. Or at least 270. Definitely start out driving slowly if you start with <300. If it's going poorly, you can always divert to one of the Vegas superchargers, but I get that that can be an annoying diversion when there's traffic.Thanks for the info! I will have to try and go from Mesquite to Beatty.
The work isn't ready, so the inspections haven't been requested. We still don't have a transformer, must be a backlog or maybe the contractor hasn't been paid??? I drive by here at least a few times a week (Home Depot is across the road for Honey-Do projects)... That trash can still looks fabulous though, a little dusty but still newAccording to the Building and Permits site, all work and inspections have been completed except for Final Building and Final Fire inspections. It's been that way for about the last 2 months. Anyone can check status by going to Permit & Application Status
Yeah I don’t understand what the hold up is. This is beyond the lead time for a transformer, maybe Tesla has decided to finish other projects or the crew & Tesla are beefin?Drove by the site today and no change... Been the same way for months. :-(
It does seem to be taking an oddly long time to get finished.Yeah I don’t understand what the hold up is. This is beyond the lead time for a transformer, maybe Tesla has decided to finish other projects or the crew & Tesla are beefin?
Could’ve used this one the other day
Dude I was hoping it'd be months ago, it was rockin then nothing. I drive by it all the time too, Home Depot & PetCo trips... I think once we see some site clean-up we'll know it's on the move again.It does seem to be taking an oddly long time to get finished.
I drive by this spot at least once a week. If there are changes, I will immediately post something here.
Our EDD on our MYLR7 is Dec'19-Jan'29. Think the site will be finished before our Y gets here? I should start a pool.
I wouldn't bet money on it. I drove by yesterday and there were no changesYou think it might be ready by October?