Well the info Source in my post #13 must have been partially incorrect. Based on the equipment and parking area, this appears to be a 8 or possibly 12 stall installation.
At least 4 stalls will be easier to ICE with only a single pickup truck towing a boat - then they can chuckle about sticking it to Tesla owners while they drive up to take a photo in front of the giant fish statue in Garrison.
If anyone is headed that direction, please take more photos to include all visible equipment and supplies. Pedestal bases if present. Pedestal boxes, (giant boxes on pallets) 4 pedestals per box nowadays. Thanks
I'm virtually certain this site will be larger than 4 stalls and could well be 12. The construction area is bigger than needed for four stalls, and in the vast majority of installations, there are four stalls per power distribution cabinet. Three cabinets equals 12 stalls in most instances.
As for what @ItsNotAboutTheMoney says, I've never seen or heard of a location that has redundant power distribution units beyond what is needed for the specific stalls.
Hopefully, someone can pop by and get photos of the installation as construction progresses.
My wife just drove by today 7/21/23 and took these pictures. I count a total of 7 pedestal bases in the pictures so I can only assume there’s an 8th around somewhere.
Thank You! It’s an 8 stall. 7 back in with possibly 1 pull in. I can just see the top of the 8th base in the second photo far left mostly hidden by the curb, but there’s also 1 unset base in the background.
It’s too bad they couldn’t do a perpendicular pull through stall.