Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - San Antonio, TX - North Loop 1604 East

This site may earn commission on affiliate links.
Work continues. The conduit is in and the bases are in place. Looks like it may be 15 stalls currently. The packing list also stated “15 Picked”.


94A343A3-0E47-447D-9C01-28E4B7B9F27F.jpeg
E8A35832-1549-4241-968B-0876BBD8742E.jpeg
EC532573-4AE2-4FD9-AADA-74736CCBDBA8.jpeg
 
Last edited:
Nice photos!

Interesting. In the similar Harlingen installation most of that was filled in with dirt first, and the concrete just for the pads for the V3 cabinets and transformer within the square wood frames.

One difference is that the Harlingen installation was built into an existing landscaped bed in the parking lot whereas here they cut into the pavement. In Harlingen they did have to pour a new curb for a small part of the bed because it was widened around the pads for the boxes.

Were there still big piles of dirt nearby? They look to have been removed because the pavement has really been cleaned up here.
 
Last edited:
Right, that makes sense. The previous piles contained big chunks of broken up pavement too.

It also looks like there is a tunnel under the pavement to a section behind that they are routing the power lines through, and that needs to be filled.

Lots of interesting details captured in your photos!
 
Nice, thanks!

Some striping and parking stops/bumpers (definitely needed for this configuration!) and the signs and labels, and they look good to go.

Well, a prior image did not show a utility transformer, so that may still be missing.
 
Last edited: