Pedestals and charging cabinets look right with 12 boxes/pallets of 2ea for a total of 24 for the first set. However, there are 12 cabinets on hand which could do 48 chargers. For 24, they would only need 6 cabinets and then maybe 1 larger cabinet for switchgear? Here is a picture from a SD thread with 24 V3. Assume they would match this design wise. Maybe they will do conduit for all 48 and do the wiring and everything else for the remaining 24 later?
View attachment 778525
There are references to phases 1 and 2 in the permits. If each phase involves a separate 24 pedestals, it's possible they have the cabinets (but not the bases) already onsite for both phases.