Supercharger - Santa Nella, CA (LIVE, 48 V3 stalls)

This site may earn commission on affiliate links.
The amenities Hotel Mission de Oro offers at this supercharger location are phenomenal! They have a full restaurant, lounge, bar, wine museum, sitting area, billiards, and even eventual wine tasting planned! Restrooms are close to superchargers and adjacent to lounge, restaurant and sitting area. They even have a grab and go station near front desk if you are doing just a short charge.

3735FDFE-EB1E-4B47-9F39-345A045F61B2.jpeg
92454D8F-CCDC-40C6-901B-06C0F5025244.jpeg
E2CD7644-0DFF-4C68-B0DF-24F7C21C1013.jpeg
AD5E78D4-8234-49F7-ABDE-5FE789F85779.jpeg
FE14397E-C9AF-455D-B6B3-CDA42B4B54B5.jpeg
EA9C1B33-A772-4947-988D-506183DD9741.jpeg
537B8270-AA5C-4D8A-AF25-5DD8C2C6E9ED.jpeg
6E117FD6-DCB2-4416-87B6-C4041C06C451.jpeg
 
There are 32 stall operational and 16 that are under wraps. It seems like there’s a new transformer on its way.
 

Attachments

  • 013BEB86-9A6A-408E-A4CD-3C15CEB90A98.jpeg
    013BEB86-9A6A-408E-A4CD-3C15CEB90A98.jpeg
    511.3 KB · Views: 68
  • 56D9E7BD-380B-4411-8E5B-00750D00983F.jpeg
    56D9E7BD-380B-4411-8E5B-00750D00983F.jpeg
    658 KB · Views: 76
Isn't that size pad more for another set of chargers or a MegaPak? I know a similar pad is sitting at the freshly opened Harris Ranch (aka Coalinga). Transformers are typically a 1/3rd that size
I am pretty sure you are correct that this is for a future Megapack. I think the large PGE transformer installed can service all 48 stalls but maybe somewhere on the utility line there is a limitation that PGE is working out before full power can be realized.
 
Woot! Thought so. I really expected these sooner, but then that is true of EVERYTHING Tesla. Now that Lathrop is up and producing more and more MegaPacks hopefully future sites that have the space will dedicate a pack to saving money on electric rates.
 
They are working on adding more, and it will be down for a few months... But some stalls will stay open. Plus they have some across the street
Across the street?? You on the other side of Highway 5 about 1/2 mile up the road. Not sure why they’re adding more when the entire site has never been open. Something doesn’t seem right, especially when they just added a megapack.
 
Across the street?? You on the other side of Highway 5 about 1/2 mile up the road. Not sure why they’re adding more when the entire site has never been open. Something doesn’t seem right, especially when they just added a megapack.
The site was open for months and we just held an event there last weekend (that's when the owner notified me that pg&e was going to shut down more than half of the chargers for power that needs to be run from the Megapack to their other site so that all buildings have power)
Prepping for 4th of July and then Thanksgiving? The day you need enough chargers for EVERYONE

ImmaterialFlimsyKitfox-size_restricted.gif


YouTube version
Exactly! The owner tried to ask PG&E to push it back, but they refused
 
The site was open for months and we just held an event there last weekend (that's when the owner notified me that pg&e was going to shut down more than half of the chargers for power that needs to be run from the Megapack to their other site so that all buildings have power)

Exactly! The owner tried to ask PG&E to push it back, but they refused
The planning around this site is abysmal🤣