You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Sorry... Just joined the forum to contribute on this thread and learning as I go... Here's the pictureGot this picture as I was driving away. Pretty sure the concrete pad is for one of those big green transformers from the power company that is needed to complete installation
Sorry... Just joined the forum to contribute on this thread and learning as I go... Here's the picture
Sorry... Just joined the forum to contribute on this thread and learning as I go... Here's the picture
Umm...just 1 charger???
Umm...just 1 charger???
I end up having to come home in a hurry on Tuesday night and wasn't able to stop and look like I thought I would.I can check it on Wednesday on my way back to Abilene (If it's not online by then). I'm in DFW right now for a couple days. Didn't even think to check on my way into DFW earlier today.
No meter present in the mount for it on the side of the transformer. The coming week is possible but I'd call it 7-14 days.View attachment 978837View attachment 978836
We stopped by around 3:00 PM on Oct 1st. A local power crew on was on site. Maybe they will fire it up this coming week