Supercharger - Waukesha, WI

This site may earn commission on affiliate links.
Now slated for Q2 2023

1676380593874.png
 
Will be a nice addition and convenient as opposed to having to drive north to Glenwood or south to Oak Creek.

In the meantime, the EA stations at Walmart on Greenfield Ave are workable, assuming you have a CCS or CHAdeMO adapter.
 
Sorry, the Meter has not been installed. the gray box is the meter receptacle housing. It’s been attached to the Switchgear cabinet since December. Also the Main Transformer is still not installed. It is supposed to be located behind the green cabinet in view. What is interesting is the presence of the Sunbelt rental Generator unit. They must need a temporary Power supply for further system testing while they wait for the real Transformer to be installed.
 
  • Informative
Reactions: Tdreamer
When folks visit, the thing to look for would be a transformer on what is (presumably) still an empty transformer pad, plus a meter installed in the gray meter socket on the side of the green switchgear cabinet. The report by @DMC5180 from 4/19 stated the transformer was still not onsite. Until both of those items are present, the site can't be energized and commissioned by Tesla.