You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I purchased a custom order X100D on Sept 1. The DS there said to expect a delivery by end of Sept.
I got assigned a VIN 68xxx on Sept 5 with a delivery estimate of late Oct to Nov.
On Sept 8, the delivery estimate change to late Sept to Oct.
Just got a call today (Sept 10) from DS saying due to the demand, they wouldn't be able to meet the end of Sept delivery. Damn! However, they did find a brand new X in inventory that just came off the line a few days ago with the same specs (VIN 65xxx). Snagged it and will get it by the end of Sept and came out to be a couple grand cheaper too. Yay! Can't wait! View specs shows APH3 and BTX6
Which is a lot easier to do when there are only a few options... (PUP, wheels, paint, three interior colors, roof for the S, and the rare things like the rear seats).More than likely - they could have built it for end of quarter but there is a growing amount of inventory that may match custom orders and it's easier to pick from inventory than go ahead and build another at this time. Makes for good logistics.
MX75D EAP, Black Premium Interior, 7 seat, VIN 67xxx. Taking delivery on Wednesday at Fremont.
Does your ViewSpec now say APH3?
It does not. But I am not worrying too much. I double confirmed with both my DS and OA whether I would be getting AP2.5. Though they did not use the term "AP2.5", they said that I would get the "redundant wiring" and the "latest and greatest AP HW". So I feel fairly confident that my car is a AP2.5. I'll also come to know on delivery date if AEB is disabled - that would be another indication that my car is an AP2.5. My car was build last week.
Fantastic! And interesting everything seems to work after all the talk about weeks until AP2.5 would work. *Maybe* that's only AEB, but I would hope it would tell you that was disabled, if so!View attachment 247151 View attachment 247150 Took delivery today! Car had 10 miles on it when I drove it off. Cruise control, air suspension and autopilot were disabled during calibration. Just short of 50 miles on the odometer adaptive cruise control and autopilot turned on. Haven't confirmed air suspension. I thought I had taken 5-10 photos of the interior at the dealer but must have been so excited the only photos I had were these.
If it was actually built in September, it has AP2.5 (should have code APH3), and has the newest updates. No matter what the sometimes inaccurate option list says.It does not. But I am not worrying too much. I double confirmed with both my DS and OA whether I would be getting AP2.5. Though they did not use the term "AP2.5", they said that I would get the "redundant wiring" and the "latest and greatest AP HW". So I feel fairly confident that my car is a AP2.5. I'll also come to know on delivery date if AEB is disabled - that would be another indication that my car is an AP2.5. My car was build last week.
MX75D EAP, Black Premium Interior, 7 seat, VIN 67xxx. Taking delivery on Wednesday at Fremont.
Your VIN is only a few behind mine, and my car is arriving this week (delayed delivery to me to next week because we're out on vacation!). I would have thought it would have definitely finished production by now. Does your DS have any light to shed?Congratulation to you.
I ordered a 75X in July, confirmed 8/1 and have been "in production" since 9/1. VIN 64,049.
How did I get so far behind????????
Your VIN is only a few behind mine, and my car is arriving this week (delayed delivery to me to next week because we're out on vacation!). I would have thought it would have definitely finished production by now. Does your DS have any light to shed?
We have the same timeline. Ordered on the same day. I am on the east coast and i am scheduled for 25th of September. I think the deliveries are consistent.My DS was out yesterday and today. Assistant says still on for delivery on 16th of September, we will see.
Since I am in SoCal, this sort of confirms the theory that they are shipping to the mid west and east coast first.
Let's hope we all get our deliveries as scheduled!
If it was actually built in September, it has AP2.5 (should have code APH3), and has the newest updates. No matter what the sometimes inaccurate option list says.
They aren't going to have two assembly lines and two sets of parts to use!