Do you know who to talk to at Tesla for this request?
Good luck.
Note that they mention "free or discounted" HPWCs and favor "prominent locations" at "destination properties."
https://teslafactory.wufoo.com/forms/q7b8imo1g0og2v/
Set up a crowd funding effort to buy HPWC's and subsidize installs, or sponsor more Sun Country Sites.
I will install one in Oshawa if I can get the HPWC for free... I have a commercial unit off Ritson north of the 401 (5 min drive) near the new Costco. I have applied to the city to get the service upgraded to 200A and then that should not be a problem. I will take care of the electrical install.
I heard that the new Montreal store/service center will have Superchargers, so the report is at least somewhat credible.
Only together with a new EV rebate, not on its own or for an additional charging station.Remember you also get 50% off the installation costs for a charger as well in Ontario.
OMG Cobourg went "Guest Only". And appears to be offline. This means the only high powered charger between Ottawa and Toronto is now the Best Western in Kingston. If that goes "Guest Only", is ICE'd (which has happened to me already), or goes offline, people are going to get stranded this winter.
It may soon be almost impossible to drive Ottawa-Toronto or Montreal-Toronto in winter conditions, at least without an overnight stay AND a substantial risk of getting stranded.
We're going back to where we were four years ago, when it was impossible to do highway travel in the winter. This is a disaster!
Doug, I agree. It is very frustrating!
I made the trip to Montreal and back using the Toronto and Cornwall Superchargers over the past couple of days. It is now very marginal, and getting worse as the temperature drops. The Kingston Supercharger is desperately needed.
The Superchargers are great, as long as you are not trying to complete a Range Charge (which takes a very long time).
I should have some new Kingston information tomorrow night....stay tuned!
Well that is awesome news. This is the one we're all waiting for!!!
The location looks fantastic - very close to the highway, at least one restaurant available, etc.
If they have a "grand opening" I'll definitely come down for it.
***KINGSTON UPDATE***
Ok, here we go...here is a link to very detailed drawings of the project. I uploaded it to my softball website, I have the flu and can't think straight, (and I don't upload files very often).
http://www.freewebs.com/kingston3pitch/ON002%20-%20KINGSTON%20-%20CD100%20-%20REV%202%20(S&S)(CITY%20COMMENTS)%2009-19-14.pdf
Looks like it will be 6 stalls for now at least. The 6 stalls in a line, but 3 parking spots on either side of the curb. They are putting the transformer and switch over beside an existing transformer, and then running power lines in the ground quite a ways to the SC cabinet and stalls location. It will be very obvious to see when they start.
My planning contact says it has no need to go through the approval process and is ready to go. She also gave me the Tesla contact who is heading up this site and I have left a voicemail with them. Hopefully they call me back and we can get some rough timelines from Tesla.
Very exciting! Hope to see ground broken soon! I'll pop by next week and take a look....was just there a few days ago and nothing.
Thanks for the plans. Lots of great detail. I don't think that we have seen one of these detailed site plans since Madison, WI. Great to see the changes with 135kW Superchargers.
Of interest. It looks like they plan for a 277/480 Volt transformer. In Squamish, they had to accept the 346/600 Canadian standard and then put in another transformer to convert that to 277/480 that the Superchargers want.
Please keep these plans on-line. If you have to take them down, let me know and we can try to host them elsewhere.