At the Pilot Travel Center. This one is a bit odd. New excavation company, new electrical contractor, Tesla listed on dig ticket but electric permit mentions 350kw stations (2). 1200A is way to much power for 2 350kw stations and Tesla doesn’t do 350kw yet. So maybe 8 V3 and 2 350kw ccs? Or just a complete miss on Tesla on the dig ticket? Thought?