You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
It actually scares me that a new later EDD is comingAnyone else get excited when the app takes an extra millisecond to load and you think it might be because you got a new EDD?
Yep, as soon as it stalls I start huffing and talking to myself. lolIt actually scares me that a new later EDD is coming
I would think Fremont would still produce some Ys, at least until Texas is running at full capacity. The Y is also the more popular model of the two (crossover things) so they’ll want all the capacity they can get to build more Ys.Ok, this is my take on things. No VIN’s reported lately and EDD’s somewhat stabilized for most of us. GigaTexas goes online April 7th with no M3’s slated to be produced there, only the new MY’s. Fremont produces M3’s and MY’s at a rate of 8,550 a week.
What if GigaTexas is going to produce the new MY’s and Fremont shifts to M3’s only. That would be a huge increase of M3’s hence the stabilized EDD’s and SA’s constantly saying the EDD you have is the time frame you’ll receive your order. If that’s so, my EDD shows a delivery date between May 6th and June 3rd. I should expect a VIN (as well as many others) in the next 2-3 weeks. Perhaps the dam is about to break?
Dang you ordered after me and got an earlier EDD even though I’m on the west coast, so much closer to the factory.Hello all,
I've had a CPO Tesla before, have never ordered a new one, so this is a different experience. Since this seems to be the place to measure production/delivery estimates, I'll share that I ordered a black/black M3LR with sport wheels (no FSD) on 3/27, initially got a vague June-Aug delivery date, which a few days later sharpened to 6/4-7/16 (and I'm in the mid-Atlantic).
Hope that helps,
Todd
Here‘s my two cents…I think your idea is the best case scenario for us M3 buyers. But I think Texas will focus on MYs with the new battery packs, which will either be the MYLR or some other new entry version. The MYPs aren’t getting the new battery packs yet and will still probably be manufactured at Fremont. This would still help free up the Fremont assembly line to shift over to M3 production. The worst case scenario is that they’ll shift to producing more MS and MX instead. More than likely we’ll end up somewhere between these two scenarios.Ok, this is my take on things. No VIN’s reported lately and EDD’s somewhat stabilized for most of us. GigaTexas goes online April 7th with no M3’s slated to be produced there, only the new MY’s. Fremont produces M3’s and MY’s at a rate of 8,550 a week.
What if GigaTexas is going to produce the new MY’s and Fremont shifts to M3’s only. That would be a huge increase of M3’s hence the stabilized EDD’s and SA’s constantly saying the EDD you have is the time frame you’ll receive your order. If that’s so, my EDD shows a delivery date between May 6th and June 3rd. I should expect a VIN (as well as many others) in the next 2-3 weeks. Perhaps the dam is about to break?
Daily occurrence for meAnyone else get excited when the app takes an extra millisecond to load and you think it might be because you got a new EDD?
I hope you are correct. OD 2/16 and eta late April to May right now. Would love to get it first part of May.Ok, this is my take on things. No VIN’s reported lately and EDD’s somewhat stabilized for most of us. GigaTexas goes online April 7th with no M3’s slated to be produced there, only the new MY’s. Fremont produces M3’s and MY’s at a rate of 8,550 a week.
What if GigaTexas is going to produce the new MY’s and Fremont shifts to M3’s only. That would be a huge increase of M3’s hence the stabilized EDD’s and SA’s constantly saying the EDD you have is the time frame you’ll receive your order. If that’s so, my EDD shows a delivery date between May 6th and June 3rd. I should expect a VIN (as well as many others) in the next 2-3 weeks. Perhaps the dam is about to break?
Fill out an entry on the spreadsheet that tracks order timelines, the more people that fill it out, the better it is! Teslike Model 3 Survey & Order Tracker #1Hello all,
I've had a CPO Tesla before, have never ordered a new one, so this is a different experience. Since this seems to be the place to measure production/delivery estimates, I'll share that I ordered a black/black M3LR with sport wheels (no FSD) on 3/27, initially got a vague June-Aug delivery date, which a few days later sharpened to 6/4-7/16 (and I'm in the mid-Atlantic).
Hope that helps,
Todd
Apparently this depends on your country. In Canada seeing “Go to account” is normal, even on a completed profile.I am not seeing "View" in my app. I see "Go to account". I remember reading somewhere, that if the app doesnt show "View" button some task is probably pending.
Is that right? Do you folks see "view" on your apps?
That’s what I read also. You have either trade-in info to update or loan application expiring. Tesla is trying to get your attention .I am not seeing "View" in my app. I see "Go to account". I remember reading somewhere, that if the app doesnt show "View" button some task is probably pending.
Is that right? Do you folks see "view" on your apps?
I see the same and I’m in Canada. I don’t see any other task to complete…I am not seeing "View" in my app. I see "Go to account". I remember reading somewhere, that if the app doesnt show "View" button some task is probably pending.
Is that right? Do you folks see "view" on your apps?
You picking up in the DC/Colma location too??OD: 2/10
EDD: 4/19 - 5/17
Config: White/White/18"/No FSD
Recently passed by the Daly City/Colma store and there weren't any M3s on the lot as far as I could tell, only MS and MX as well as used cars.
Still no update on my EDD since OD. Hoping I get some sort of update soon as the beginning of my EDD is in 2 weeks!
Ordered the exact same config on the same date except MSM and East Coast. My EDD has been sitting at May 24 - June 21 since. No movement.OD 3/4 LR AWD, Blue, Black, Aero, FSD in the Bay Area
EDD May 28 - June 25, no update since ordering