I am almost ready to take my M3P with VIN number, finance check and paid down payment, and it is scheduled for delivery this week.
But after doing some research, I consider to change the M3P to M3LR because I never track and the road of bay area is terrible for M3P. Besides I was ordering M3P due to its good looking, and I found the wheel cover can be changed easily.
The question now is:
If I decline the delivery, release the car, edit the design to M3LR(18'' wheel), Does it put me back to the end of LR queue ?
1. I found quite a lot of people get VIN assigned again so quickly(less than one month) after they declined the delivery or resume after the hold.
2. But when I talked to the SA, he told me that I might need to wait til the end of year according to the timeline show in the Tesla website, due to going back to the queue.
Do you know which one is corrected ? I do not find similar cases here so trying to looking for help.
I am planning get the car within two months so the APR rate can be locked. Otherwise, I might consider to keep M3P.
Thanks guys.
But after doing some research, I consider to change the M3P to M3LR because I never track and the road of bay area is terrible for M3P. Besides I was ordering M3P due to its good looking, and I found the wheel cover can be changed easily.
The question now is:
If I decline the delivery, release the car, edit the design to M3LR(18'' wheel), Does it put me back to the end of LR queue ?
1. I found quite a lot of people get VIN assigned again so quickly(less than one month) after they declined the delivery or resume after the hold.
2. But when I talked to the SA, he told me that I might need to wait til the end of year according to the timeline show in the Tesla website, due to going back to the queue.
Do you know which one is corrected ? I do not find similar cases here so trying to looking for help.
I am planning get the car within two months so the APR rate can be locked. Otherwise, I might consider to keep M3P.
Thanks guys.