Weekly update on the two sites here ...
16 pedestal site in Lenox Road deck:
Cabinets are done, pedestals are done, asphalt and painting are done. The high-voltage connections at the transformers are NOT done, and appear to be waiting for inspection. Fences are still up.
Hey Tesla, if you are reading this, post a sign telling people where the mall entrance is (under the Herzing U sign). They will totally miss it otherwise. Ask me how I know.
5 pedestal site at north edge of north parking lot:
Work is now under way on trenching, conduits and concrete forming.
16 pedestal site in Lenox Road deck:
Cabinets are done, pedestals are done, asphalt and painting are done. The high-voltage connections at the transformers are NOT done, and appear to be waiting for inspection. Fences are still up.
Hey Tesla, if you are reading this, post a sign telling people where the mall entrance is (under the Herzing U sign). They will totally miss it otherwise. Ask me how I know.
5 pedestal site at north edge of north parking lot:
Work is now under way on trenching, conduits and concrete forming.