Weekly update on the two sites here ...

16 pedestal site in Lenox Road deck:

Cabinets are done, pedestals are done, asphalt and painting are done. The high-voltage connections at the transformers are NOT done, and appear to be waiting for inspection. Fences are still up.

Hey Tesla, if you are reading this, post a sign telling people where the mall entrance is (under the Herzing U sign). They will totally miss it otherwise. Ask me how I know.

5 pedestal site at north edge of north parking lot:

Work is now under way on trenching, conduits and concrete forming.
 

Attachments

  • 20180712_143132.jpg
    20180712_143132.jpg
    695 KB · Views: 261
  • 20180712_141938.jpg
    20180712_141938.jpg
    463.3 KB · Views: 236
Weekly update:

16 pedestal / Lenox Road site: hasn't changed much. They finished the permanent brown fence surrounding the cabinets. The temporary chain link fence is still up. The high voltage connection is still waiting to be completed (see picture in last week's update) so I think this is waiting for inspection or something.

5 pedestal / north lot site: conduit appears complete, 3 of 5 pedestal bases are in, concrete form for rack pad is done. Less progress than I would have expected.
 
Weekly update ...

16 pedestal site: utility connection has finally been made! Temporary fencing is gone. Pedestals are bagged, parking spots have cones. Workers were onsite working on a pedestal. Three pictures attached.

5 pedestal site: pedestals are done, Tesla cabinets are done! The switchgear concrete base still needs to be poured, and then those cabinets placed. I've said that the transformer is already there, but there's also huge utility conduit poking out of the ground so I'm not really sure about that. This one could still be a couple weeks off. Two pictures attached.
 

Attachments

  • 20180724_151305.jpg
    20180724_151305.jpg
    455.9 KB · Views: 194
  • 20180724_151030.jpg
    20180724_151030.jpg
    404.6 KB · Views: 207
  • 20180724_151525.jpg
    20180724_151525.jpg
    413.5 KB · Views: 209
  • 20180724_152441.jpg
    20180724_152441.jpg
    639.5 KB · Views: 204
  • 20180724_152513.jpg
    20180724_152513.jpg
    482.4 KB · Views: 204
Weekly update:

16 pedestal / Lenox Road site: hasn't changed much. They finished the permanent brown fence surrounding the cabinets. The temporary chain link fence is still up. The high voltage connection is still waiting to be completed (see picture in last week's update) so I think this is waiting for inspection or something.

5 pedestal / north lot site: conduit appears complete, 3 of 5 pedestal bases are in, concrete form for rack pad is done. Less progress than I would have expected.

Chris, thanks for sharing all his information. So happy to see this coming up. I am curious to see how the 5 pedestal turns out to be. It appears it is next to Peachtree right opposite Westin (previously known as Swissotel) which is a very busy parking area. I fear non-tesla owners will park on these spot.
 
Update:

16 pedestal site: plastic bags are off, cones are still up. The pedestals have stall numbers -- 1A, 1B, 2A etc up to 8B.

5 pedestal site: temp fencing still up, pedestals still bagged, no numbers on pedestals, but otherwise seems done. Asphalt is freshly paved and painted. Utility meter is missing, so likely waiting on inspection. There's still that big conduit mysteriously poking out of the ground nearby.

I think they are going to put both of these online at the same time, which now seems like it could be any day now.
 
The 16 bay site has pretty much looked like this for the last 2 weeks. It looks like they are waiting for inspection.
 

Attachments

  • 20180803_105450.jpg
    20180803_105450.jpg
    355.4 KB · Views: 150
  • 20180803_105613.jpg
    20180803_105613.jpg
    265.3 KB · Views: 148
  • 20180803_105804.jpg
    20180803_105804.jpg
    249.6 KB · Views: 150
  • 20180803_113457.jpg
    20180803_113457.jpg
    285.2 KB · Views: 154
  • Like
Reactions: Acps110
Update:

16 pedestal site: cones are still up. No change since August 6th.

5 pedestal site: temp fencing is down, cones up instead. Pedestals still bagged, no numbers on pedestals, but otherwise seems done. Utility meter is now installed. Picture attached.

I forgot about the big conduit mysteriously poking out of the ground nearby, so maybe they did something with it.

This is now officially tiresome.
 