I swung by the Baker SC again today and took a couple pics. Looks like it coming along fast. Transformers are in, SC Cabinets, Power Cabinets, conduit, Concrete work. Maybe in a month or two we will have SC ver 4s installed?
I swung by the Baker SC again today and took a couple pics. Looks like it coming along fast. Transformers are in, SC Cabinets, Power Cabinets, conduit, Concrete work. Maybe in a month or two we will have SC ver 4s installed?
Hi, would you be able to also update the "Forum" link for the expansion to this thread? The current link goes to the original Baker location thread. Thanks!
I went through here on May 24th and the solar canopies were already painted and solar was being wired. Lot was paved and all the stalls were in and some being wired. I assume this will be like other SC's in SCE territory waiting on the transformer to show. The Tesla app actually shows as of tonight 32 of 48 available(250kw max), Baker originally was only 40 so some of the new 250kw are working now.