Anyone have any update on this one? I plan on driving to Pensacola, FL on October 25, and it would be great if I could charge up in Hattiesburg.

No noticeable progress in the last couple of weeks. The construction crew that was working this project is now over in McComb presumably bringing that site up to the same point. A rep from Stirling Properties wouldn’t give a specific date but just said they would be available by the end of the year.
 
  • Informative
Reactions: MarcoRP
Seems optimistic based on the photos. Just watching others comes together they usually look complete them have to be "turned on/inspected" a couple of weeks later.

Nice to see another Bulldog here.

Hattiesburg Supercharger will be great. Almost as nice as a Starkvegas Supercharger would be. The new ChargePoint chargers are big help. I just wish that they had a few on campus.
 
  • Like
Reactions: PStewart
Hattiesburg Supercharger will be great. Almost as nice as a Starkvegas Supercharger would be. The new ChargePoint chargers are big help. I just wish that they had a few on campus.

Starkville is in serious need of public charging. I can safely make it from Jackson and back, but there isn't much wiggle room. Any sort of public charging around the Cotton District or Main St would make those round trips much more relaxing.

I've sent the Mayor a message cause she is really active on twitter, but no response.
 
  • Like
Reactions: PStewart
Starkville is in serious need of public charging. I can safely make it from Jackson and back, but there isn't much wiggle room. Any sort of public charging around the Cotton District or Main St would make those round trips much more relaxing.

I've sent the Mayor a message cause she is really active on twitter, but no response.
Starkville added 4 ChargePoint charging stations in September. 2 are near Main St and 2 are near Travis Outlaw rec center.
 
As of November 10th 2019 nothing still
 

Attachments

  • 20191110_170046.jpg
    20191110_170046.jpg
    353.4 KB · Views: 143
  • 20191110_170022.jpg
    20191110_170022.jpg
    367.9 KB · Views: 123
Noo! I need one of these new MS Superchargers to be up and running prior to Thanksgiving holiday... Otherwise I'll be camping out at an L2 in a Biloxi casino some time that weekend.

There is a Level 3 Charger in Gulfport at the Outlet Mall, but it is an Electrify America managed charger. Plug types are CCS and CHaDemo. I wish Tesla made a CCS adapter like the current CHaDemo adapter they sell. Hopefully it’s coming soon as Europe already uses the CCS standard in their Model 3’s.
 
Noo! I need one of these new MS Superchargers to be up and running prior to Thanksgiving holiday... Otherwise I'll be camping out at an L2 in a Biloxi casino some time that weekend.

Great news! McComb, MS SuperChargers are online as of today. Hattiesburg, MS SuperChargers are being completed now and will be online later this evening. They will both show up in nav maps either Sunday or Monday!
 
Great news! McComb, MS SuperChargers are online as of today. Hattiesburg, MS SuperChargers are being completed now and will be online later this evening. They will both show up in nav maps either Sunday or Monday!
Thanks Josh. Were you able to get any photos so I can confirm?
 
Oh! Are you talking about the stalls being installed or the location actually being operational?

Both. The sites were both completed up to the point wheee the stalls needed to be placed, final connections made, and power turned on (and operational checks and such...). All that was completed for McComb today and you can charge there now. McComb is fully operational at this time. Will show up in vehicle nav tomorrow or Monday.

Those tasks are being completed at the Hattiesburg location now. They anticipate finishing up and having Hattiesburg online later this evening. Will be able to charge there no later than tomorrow.
 
Both. The sites were both completed up to the point wheee the stalls needed to be placed, final connections made, and power turned on (and operational checks and such...). All that was completed for McComb today and you can charge there now. McComb is fully operational at this time. Will show up in vehicle nav tomorrow or Monday.

Those tasks are being completed at the Hattiesburg location now. They anticipate finishing up and having Hattiesburg online later this evening. Will be able to charge there no later than tomorrow.

McComb shows up in vehicle nav this morning.

Hattiesburg will show up in vehicle nav tomorrow. However, they are online and available for charging. We are charging at the Hattiesburg location as I type this.
 

Attachments

  • C6B51F4E-A039-4329-AA51-147D802FC21A.jpeg
    C6B51F4E-A039-4329-AA51-147D802FC21A.jpeg
    459.1 KB · Views: 107
  • 77FCC926-159F-440B-AA65-06FE0F2BC6AF.jpeg
    77FCC926-159F-440B-AA65-06FE0F2BC6AF.jpeg
    523.3 KB · Views: 100
  • 913F0CDC-5989-4F51-8A2C-1A1858492318.jpeg
    913F0CDC-5989-4F51-8A2C-1A1858492318.jpeg
    736.6 KB · Views: 104
  • 8975C10D-7944-42A4-BB70-4DBE4FC1223D.jpeg
    8975C10D-7944-42A4-BB70-4DBE4FC1223D.jpeg
    805.7 KB · Views: 84
  • 7663A798-FD2E-4E80-908C-B2B6032F5FFB.jpeg
    7663A798-FD2E-4E80-908C-B2B6032F5FFB.jpeg
    608.2 KB · Views: 83
  • 09D97604-2180-4466-958C-226A5AD7395F.jpeg
    09D97604-2180-4466-958C-226A5AD7395F.jpeg
    620.7 KB · Views: 84
  • F514FFBA-2AB6-4217-A2DC-82F9AB8FE4E8.jpeg
    F514FFBA-2AB6-4217-A2DC-82F9AB8FE4E8.jpeg
    765 KB · Views: 85
  • EF740393-6ACE-49D6-8934-69A59E170A00.jpeg
    EF740393-6ACE-49D6-8934-69A59E170A00.jpeg
    711 KB · Views: 95
  • BAE8022A-E68D-4990-A456-F6EE82D5D923.jpeg
    BAE8022A-E68D-4990-A456-F6EE82D5D923.jpeg
    383.1 KB · Views: 96
  • AC735708-9669-4ADD-8D48-1478CF9C34F2.jpeg
    AC735708-9669-4ADD-8D48-1478CF9C34F2.jpeg
    556.4 KB · Views: 95