Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Supercharger - Las Vegas, NV - Grand Central Parkway (North Premium Outlets)

This site may earn commission on affiliate links.
I think I stumbled across a Supercharger in the permitting process at the North Premium Outlets.

L19-00185 - OffSite Permit (OffSite)
Key Number: 943654
Current Status: Collect Permit Fees
Application Received: 2/5/2019
Project Name: TESLA SUPERCHARGERS - NORTH PREMIUM OUTLETS
Address:
Parcel:
13933710005
Type of Work: Utility
Unpaid Fees: $150.00
Expiration Date: 8/4/2019
Location Of The Project: GRAND CENTRAL AND BONNEVILLE
Scope of Work: NVE PLANS FOR TESLA SUPERCHARGERS - NORTH PREMIUM OUTLETS - GRAND CENTRAL AND BONNEVILLE

Primary Applicant is listed as Tesla Energy, along with NV Energy and SIMON CHELSEA LV DEV, LLC
 
1BE3A9C9-09A0-4123-BBD4-9A4DCE098C70.jpeg
Seems like Chuq and BlueShift missed the call for this one : I’ve just added it on supercharge.info but put 8 stalls as it’s a norm for most Superchargers. Feel free to dm me if you found the right number of stalls. Thanks
 
  • Informative
Reactions: DDotJ
It appears the permit was issued (or maybe re-issued) today:

19-00185 - OffSite Permit (OffSite)
Key Number:
943654
Current Status: Inspections
Application Received: 2/5/2019
Project Name: TESLA SUPERCHARGERS - NORTH PREMIUM OUTLETS
Address:
Parcel:
13933710005
Type of Work: Utility
Permit Issued: 12/9/2019
Expiration Date: 12/9/2020
Location Of The Project: GRAND CENTRAL AND BONNEVILLE
Scope of Work: NVE PLANS FOR TESLA SUPERCHARGERS - NORTH PREMIUM OUTLETS - GRAND CENTRAL AND BONNEVILLE
 
Possible construction? I didn't get a picture this morning, but it seems they're working on the parking lot in the NW corner of the site. If you exit NB I-15 at Charleston, and take the exit across for the Alta/Bonneville exit you can see where it looks like they're building a retaining wall, it might also be where they are going to put the SC station. It seemed like the parking lot section is closed (didn't see any cars in that section, only work trucks).
 
Possible construction? I didn't get a picture this morning, but it seems they're working on the parking lot in the NW corner of the site. If you exit NB I-15 at Charleston, and take the exit across for the Alta/Bonneville exit you can see where it looks like they're building a retaining wall, it might also be where they are going to put the SC station. It seemed like the parking lot section is closed (didn't see any cars in that section, only work trucks).

I drove by today and nothing happening. I saw what you said, pallets with cinderblocks for the wall maybe but nothing beyond that. I also didn’t want to pay $8 to go see either.

Seems like a horrible spot though. That shopping area is always busy and I’m assuming it’ll be a code to get in like the Linq since it’s paid parking there. We need a SC on the NW side of town. Like Sky Pointe Canyon in the Smith’s parking lot
 
I stopped by 17 March and took some pictures from the parking garage. Trench work and pipe work is in the process. You can see the curb structure too. It’s going to be a mess to get to these chargers when done but at least there’s plenty to do once you’re parked and charging.

Sorry some of the thumbnail pics aren’t loading...
 

Attachments

  • 734F3304-76EC-4D7B-AD17-D3A5C8E0F42F.jpeg
    734F3304-76EC-4D7B-AD17-D3A5C8E0F42F.jpeg
    443.7 KB · Views: 204
  • D9D7FD26-D711-4A31-B395-9297B46B2E94.jpeg
    D9D7FD26-D711-4A31-B395-9297B46B2E94.jpeg
    797.6 KB · Views: 188
  • 463E9B7A-5D28-4098-88D7-980C9655436A.jpeg
    463E9B7A-5D28-4098-88D7-980C9655436A.jpeg
    680.1 KB · Views: 194
  • 7154B1CD-D3F4-492F-B34C-BA9B355C9ED3.jpeg
    7154B1CD-D3F4-492F-B34C-BA9B355C9ED3.jpeg
    563.1 KB · Views: 211
  • BED750E1-9818-4A34-B2C9-EAA9AFB4B372.jpeg
    BED750E1-9818-4A34-B2C9-EAA9AFB4B372.jpeg
    1.1 MB · Views: 205
  • D57EC664-24E8-433C-B2CB-7762931F139C.jpeg
    D57EC664-24E8-433C-B2CB-7762931F139C.jpeg
    670.1 KB · Views: 208
  • E1B7FCCB-4E3B-4EC5-B807-C10AA23F0003.jpeg
    E1B7FCCB-4E3B-4EC5-B807-C10AA23F0003.jpeg
    677.9 KB · Views: 208
I ventured out today (14 April 2020) to check status on the build. Doesn’t look like anything has happened, bummer.
 

Attachments

  • CFFF9D4C-4A7B-4D8A-AB02-60925C1CFF59.jpeg
    CFFF9D4C-4A7B-4D8A-AB02-60925C1CFF59.jpeg
    399.8 KB · Views: 156
  • ADA45CE1-F20E-4858-AF66-06674A07B9F1.jpeg
    ADA45CE1-F20E-4858-AF66-06674A07B9F1.jpeg
    503.4 KB · Views: 159
  • 8F254CCE-7460-4BFF-83F7-34D8B9184BBD.jpeg
    8F254CCE-7460-4BFF-83F7-34D8B9184BBD.jpeg
    358.2 KB · Views: 167
  • 33254829-581F-47D5-9A9D-F029B779CEA2.jpeg
    33254829-581F-47D5-9A9D-F029B779CEA2.jpeg
    400.1 KB · Views: 152
  • 6F46F75A-26C7-4D74-9C02-C8F543487210.jpeg
    6F46F75A-26C7-4D74-9C02-C8F543487210.jpeg
    300.2 KB · Views: 141