New Construction really confirmed.
On Friday, April 22, we stopped for lunch on our east bound trip, and saw the trenches and vertical pipes stubs.
Today, Sunday the 24th, headed back west, progress had been made with the installation of the RED covers on the pipes and ONE TESLA VEHICLE CHARGING ONLY SIGN
On Friday, April 22, we stopped for lunch on our east bound trip, and saw the trenches and vertical pipes stubs.
Today, Sunday the 24th, headed back west, progress had been made with the installation of the RED covers on the pipes and ONE TESLA VEHICLE CHARGING ONLY SIGN
Attachments
Last edited: