Shmoe
Member
I'm told by the local TOC that this supercharger is now openI wonder what is taking forever!! I have been waiting to charge here!
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I'm told by the local TOC that this supercharger is now openI wonder what is taking forever!! I have been waiting to charge here!
Not working yet- Just checked it out. Plugged in and charger became red
It's temporary. Due to damage from the remnants of Hurricane Ida.Why is Paramus closing?
Can confirm about half the chargers are up. But tesla reports you should get 250KW off these chargers and i got a max of 60-70.
Charging speed depends on several factors including battery temperature and state of charge. Your results could be perfectly normal for whatever conditions you had during your test.
Does ur car charge faster ever? Older ones don't. My 17 MX does around 145max, so that would be good.Just came back from charging at Lodi and max output I had was about 135kw with a preconditioned battery starting at 21%.
Yes, I've charged at the Woodcliff Lake location and had over 200kW with preconditioned battery starting around 35%.Does ur car charge faster ever? Older ones don't. My 17 MX does around 145max, so that would be good.
Also what I've noticed is new chargers take a few weeks to test/calibrate, whatever. So will improve. I've been to several chargers as they were opening.
It's an EXCELLENT location, a bit annoying in rush hour though due to crappy off ramps being loaded bc som idiots don't know how to build roads. The wawa with the food and bathrooms right there and it being on several key nyc arteries is just golden.
I was there last night to get enough of a charge to get back home to Long Island. The conditions were terrible. All the spots were taken by non-Tesla shoppers (?) at the WaWa. Once a spot opened, spot 2B, the charger had trouble connecting. It seemed to be so worn that the contacts weren't efficient. Finally, made contact.Thanks to Darryn from Drive Tesla for sending me a screenshot of a Facebook post in which someone found construction for the Lodi, NJ Supercharger at the Wawa. According to the manager they will be online in about a month.
View attachment 652051
I just left Lodi about 20 min ago, was getting much less than you -- 73kW when I started. I was at 47%, not sure if that's the reason.