You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Everything looks completed. All necessary transformer parts look good. Just need the fence down. Unless the detached part still needs something.Went by today. View attachment 1007543
As you can see, the meter is installed. (The transformer was there before the permit was even granted.) The stalls are striped, though as yet, there is nothing to keep cars from backing into the chargers.
As Get-Atty posted above, it is a split site. The main site is where the transformer is located and has eight stalls. Another four are along the exit from the Wendy's drive through.
View attachment 1007545
Anybody have any idea why the site isn't open yet? The meter has been installed for the transformer (which even has a sign saying "Tesla Charging Station). The numbers on the meter appear to read 00006.
View attachment 1007546
View attachment 1007547