Construction progress pictures today, December 3, 2022, at the Mesa Supercharger site, 1859 S Stapley Dr, Mesa, AZ. No workers on site in the rain today and the construction fence makes it difficult to take pictures. I took these pictures blindly by holding the camera above the top of the fence. The transformer, switchgear and charger cabinets are installed. The 12 charging posts are on site (shown in previous post #45) but not installed. No evidence of any wire pulled in. The yellow construction taped area is probably for the conduit to the utility connection.
IMG_6388.jpg
IMG_6389.jpg
IMG_6390.jpg
IMG_6391.jpg
 
Hey!! Some daytime photos. I believe that some wires were pulled today to the pedestals themselves. Transformer is on site. No SRP transformer wire work yet.
 

Attachments

  • 7C37B5FC-5D24-430B-B451-61183FFB66B8.jpeg
    7C37B5FC-5D24-430B-B451-61183FFB66B8.jpeg
    838.2 KB · Views: 66
  • F636665C-164F-4E46-ACC9-14E02A8E5C92.jpeg
    F636665C-164F-4E46-ACC9-14E02A8E5C92.jpeg
    944.6 KB · Views: 63
  • 9098C66E-24BD-41A0-B501-3C276E534FC5.jpeg
    9098C66E-24BD-41A0-B501-3C276E534FC5.jpeg
    910 KB · Views: 63
  • 1EC6544F-1B95-46C6-A345-8D2FFED34671.jpeg
    1EC6544F-1B95-46C6-A345-8D2FFED34671.jpeg
    729.7 KB · Views: 63
  • 482DE646-F537-43D4-92F0-AD98E5A49032.jpeg
    482DE646-F537-43D4-92F0-AD98E5A49032.jpeg
    673.7 KB · Views: 61
  • EE727004-F0DE-4409-A127-34E8B8CCC14D.jpeg
    EE727004-F0DE-4409-A127-34E8B8CCC14D.jpeg
    664.5 KB · Views: 62
  • 9296D2EF-D66E-405B-8ACF-8C69A51880E9.jpeg
    9296D2EF-D66E-405B-8ACF-8C69A51880E9.jpeg
    1.1 MB · Views: 70
  • 9B76F8FC-0495-469F-B2B7-0234EBAC599C.jpeg
    9B76F8FC-0495-469F-B2B7-0234EBAC599C.jpeg
    817.2 KB · Views: 67
Just caught the SRP guys pulling out in their truck around 11:15am and they said in their testing they noticed the oil gauge was registering at zero so they are going to have to get that checked out before they can turn it on. They weren't sure if it just needed oil or if they need to get a new transformer. They said they are hoping it could be open by Friday.
 
Last edited:
Some other soon to be ready tells are full site clean up, stall stripes, stall tire curb stops, fencing/equipment removal and then….’red power lights.’

It’s concerning that there may be low oil in the transformer. Maybe the gauge? Humm, SRP’s gauge??? I thought transformers were sealed units??? I need some edge-a-ma-cation on transformers🥴. Anyone🫡?

Let’s hope it’s a quick fix. ✔️👍🏻