Planning Board Approval- 2018-09-17 (PDF Warning)
8 Supercharger stalls, 2 signed for Tesla-only parking + 6 signed for General parking w/time limit
Google maps location- pretty much at the intersection of NY-23 and I-88. Or, a bit off I-88 right between Binghampton and Schenectady.
I couldn't find if Oneonta had their building permits viewable online. But this might have just been a search failure. And while Tesla's map shows Oneonta as a 2018 "Coming Soon" pin, I wouldn't expect this site to be online until some time in 2019. But I could be wrong and it definitely deserves a scoping by anyone in the area.
Henry Misas/Tesla Installation Manager, Supercharger Deployment and Alex Mirabito/Mirabito Fuel Group appeared before the board to represent the application submitted by GPD Engineering and Architecture Professional Corporation to install a Tesla supercharging station within the existing parking lot of Mirabito's located at 4968 State Highway 23. They will be using a total of 8 existing stalls...
8 Supercharger stalls, 2 signed for Tesla-only parking + 6 signed for General parking w/time limit
Google maps location- pretty much at the intersection of NY-23 and I-88. Or, a bit off I-88 right between Binghampton and Schenectady.
I couldn't find if Oneonta had their building permits viewable online. But this might have just been a search failure. And while Tesla's map shows Oneonta as a 2018 "Coming Soon" pin, I wouldn't expect this site to be online until some time in 2019. But I could be wrong and it definitely deserves a scoping by anyone in the area.