rayluis1988
Member
for sure. I have been/still waiting for the valley to get much more needed SC.FINALLY! This is the best thing I have seen in a long time!
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
for sure. I have been/still waiting for the valley to get much more needed SC.FINALLY! This is the best thing I have seen in a long time!
I meant activity referring to construction upstairs (cabling, stalls, cabinets, etc). All the construction so far is on the ground-conduit work.thanks for the updates!
but that parking lot will NEVER be full
I meant activity referring to construction upstairs (cabling, stalls, cabinets, etc). All the construction so far is on the ground-conduit work.
ohhhh ok, yeah, it does not get full at all. The only packed areas are the ones right next to the elevator (of course, very active people in this country trying to walk the minimum distance lol)oh! my comment of it never being full was in regards to someone saying the lot will be busy during the holidays
sherman oaks galleria is nothing like the thriving mall it once used to be (fast times at ridgemont high days hahahaha)
That pretty much confirms it! Time for a title change.Always lots of activity here, but now starting to see the first bits above ground. I think I also saw two more cabinets over by the area where the conduit is installed. Lots happening fast it seems. (I hope)
I will assume they will wire them like the Santa Maria one, going up to the roof and then out.Not that we need nearly daily updates, but I happen to be here a lot... a few pedestals have already gone in, no wiring yet. Anyone know how they wire these things when they are already installed like this??View attachment 809559
Yeah - on a slope.Thread title still says "permit issued". Time for a title change
Interesting configuration. Not sure I have seen that before.
They can pass the wires through the dark gray bases down the line of pedestals. They will probably need to put some kind of transition sheet metal over the gaps between the bases. They might also core through the floor to a lower level and run conduit from there to the cabinets. The white covers come off the pedestals so they can wire up the pedestals to the long cable from the charger cabinet.Not that we need nearly daily updates, but I happen to be here a lot... a few pedestals have already gone in, no wiring yet. Anyone know how they wire these things when they are already installed like this??
thanks for the pics gravykev....but
ughhhh
i totally forgot how freakin tight these parking spaces are in this garage