in2survive
Member
In a few days you should receive an updated EDD with about 1 month range, my bet would be March…Hi folks,
Just placed the order. June delivery date.
Best wishes for the holidays.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
In a few days you should receive an updated EDD with about 1 month range, my bet would be March…Hi folks,
Just placed the order. June delivery date.
Best wishes for the holidays.
I wish I could say that you are going to get your car very soon but most likely the EDD will change a few times before you get your car.New here. Ordered MY Blue on 10/30. Till this morning EDD was showing June 2022. Suddenly this morning it changed to Dec 14-31. I know this date mostly does not mean much but do you guys think this could be true?
Long range or performance? I ordered long range August 27 and I’m still waiting.New here. Ordered MY Blue on 10/30. Till this morning EDD was showing June 2022. Suddenly this morning it changed to Dec 14-31. I know this date mostly does not mean much but do you guys think this could be true?
Long Range 7 seater, 20" wheels, FSD.Long range or performance? I ordered long range August 27 and I’m still waiting.
I know it is wishful thinking but do hope the date is true and that I am getting the best Christmas present .Long range or performance? I ordered long range August 27 and I’m still waiting.
It appears MY LR that includes the 20" wheels are getting earlier delivery dates.Long Range 7 seater, 20" wheels, FSD.
I also ordered MY LR, 19'' wheels, 7 seater, white exterior on 11/16 and the EDD is March 23 to April 30, 2022. So, it may not be related to the wheels?It appears MY LR that includes the 20" wheels are getting earlier delivery dates.
Excellent analysis.I'll check to see how this ages in a few weeks. Lol
Giga Austin posted 1,100 jobs three weeks ago. The Q3 report shows completed office/admin areas, part stamping lines, beginning stockpiles of sub assemblies, and test-line beta builds of one piece front and rear castings. They already have beta-build Y's running around Austin with employees to QC test as they tune the line.
They do not have (and will not have for a damn long while) the 4680 batteries, or structural battery format. The Anode and Cathode test-line production equipment got delivered early this week, and they still are supposedly having issues with cathode forming at scale. I think they will put them in the CyberTrucks at a lower output, until they are produced at enough scale to match the target production numbers for the MY. They don't want the good/better comparison for Fremont/Austin MY's based on production differences with batteries. It's probably a tough enough pill to swallow for the front castings at Austin, until they volume gets high enough to buy Fremont the time to retool without overall output suffering.
We'll see Austin-built (casted front/rear) MY's delivered before Christmas.
Very similar here too... Went back to June this morning... Hope that's temporary....Ok, I will join this thread too. Ordered my blue MYLR, stock wheels, no FSD, black interior, tow hitch, 5 seats on 11-10. Had June, 2022 EDD at first, it briefly moved up to Mar-April, then today back to June. Was getting excited, but not worried about waiting a few more months either. If it gives time for Austin to be up and running with kinks ironed out before they get to my car, I am fine with that.
Yes, you touch on something that’s getting little attention: It will be a long time probably before Austin can match Fremont quality. It took Fremont quite awhile to get to point where cars are coming out pretty good. My current March-April EDD feels like it might be around the tipping point where Austin builds start to show up in some number on East Coast.Ok, I will join this thread too. Ordered my blue MYLR, stock wheels, no FSD, black interior, tow hitch, 5 seats on 11-10. Had June, 2022 EDD at first, it briefly moved up to Mar-April, then today back to June. Was getting excited, but not worried about waiting a few more months either. If it gives time for Austin to be up and running with kinks ironed out before they get to my car, I am fine with that.
Probably not. The regulatory approval is requested for Dec 31.I'll check to see how this ages in a few weeks. Lol
Giga Austin posted 1,100 jobs three weeks ago. The Q3 report shows completed office/admin areas, part stamping lines, beginning stockpiles of sub assemblies, and test-line beta builds of one piece front and rear castings. They already have beta-build Y's running around Austin with employees to QC test as they tune the line.
They do not have (and will not have for a damn long while) the 4680 batteries, or structural battery format. The Anode and Cathode test-line production equipment got delivered early this week, and they still are supposedly having issues with cathode forming at scale. I think they will put them in the CyberTrucks at a lower output, until they are produced at enough scale to match the target production numbers for the MY. They don't want the good/better comparison for Fremont/Austin MY's based on production differences with batteries. It's probably a tough enough pill to swallow for the front castings at Austin, until they volume gets high enough to buy Fremont the time to retool without overall output suffering.
We'll see Austin-built (casted front/rear) MY's delivered before Christmas.
I like the idea of the new casting, and also would really love build quality to be more in line with better results people have been talking about more recently. Hoping they get the front casting stuff on the line in Fremont soon, before my car is made, as I see West Coast-ish (I am in the west, but Intermountain/Rockies) are going to still come from Fremont?Yes, you touch on something that’s getting little attention: It will be a long time probably before Austin can match Fremont quality. It took Fremont quite awhile to get to point where cars are coming out pretty good. My current March-April EDD feels like it might be around the tipping point where Austin builds start to show up in some number on East Coast.
I’ll take what I get, but it seems like tossup as to what is better, Fremont build quality or weight savings from front casting.
Mine has always stayed at June.Very similar here too... Went back to June this morning... Hope that's temporary....