You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
This was floating around. This part was not accruate. Order dates don't mean much in a vin allocation. I have seen later with a vin.The cutoff for the Q1 Aus cars was apparently around the 20th of Dec.
is there a chance then that earlier orders have been missed for VIN allocation?This was floating around. This part was not accruate. Order dates don't mean much in a vin allocation. I have seen later with a vin.
Registration Papers signed this afternoon
Model 3 RWD
White Exterior
Black Interior
Standard Aero Wheels
Ordered 02/12/2021
Also took a Model 3 RWD for a test drive and tested my charging at home. I got the 7KW charge running from a 3 Phase 32amp tail so that is good for those time I may need a hurry. But overnight will be fine normally. The reason for the faster charge is I can charge about midday empty the solar battery and still charge it up for the night use in the house.
Hi Jimbowa,Registration Papers signed this afternoon
Model 3 RWD
White Exterior
Black Interior
Standard Aero Wheels
Ordered 02/12/2021
Also took a Model 3 RWD for a test drive and tested my charging at home. I got the 7KW charge running from a 3 Phase 32amp tail so that is good for those time I may need a hurry. But overnight will be fine normally. The reason for the faster charge is I can charge about midday empty the solar battery and still charge it up for the night use in the house.
If you ordered on 13/11 and did not make changes to it you should have a VIN or one allocated. Call your Tesla guy as the Midas is in PK and Crystal will be in Brisbane on the 9th and PK on the 13th.is there a chance then that earlier orders have been missed for VIN allocation?
I ordered on the 30 Nov and don't have a VIN yet. My understanding from what Vedaprime has said is that this isn't really a problem yet. My EDD is still 8-12 weeks from order date.If you ordered on 13/11 and did not make changes to it you should have a VIN or one allocated. Call your Tesla guy as the Midas is in PK and Crystal will be in Brisbane on the 9th and PK on the 13th.
Vin allocation is hardly based on order date. Only what goes down the production line. I expect more vin allocation this qtris there a chance then that earlier orders have been missed for VIN allocation?
Unfortunately my Sparky is FIFO and doesn't really do work on the swing but he wired the house for me many years ago so did it for me. I had to purchase all the items. But I got another Sparky to look at it I just said I wanted 5 pin for a big welder I use.Hi Jimbowa,
Do you have the name of electrician who did your install.
I have been trying to get my usual electrician to give me a quote, but he's not getting back to me
Tesla gave me an electricians name, but they seem to be applying the "Tesla tax"
Thanks in advance
SteveT
Yes, I have the same issue.Ordered on 12/12 for a base White RWD and app is now showing 14-20 weeks? Anyone in the same situation?
UPDATE: Tesla advised that based on my order date, I can expect a VIN to be allocated in the next 1 - 3 weeks? Apparently they had a huge backlog of orders. hmmm
I wonder how many times vedaprime has said this throughout their Tesla tracking careerVin allocation is hardly based on order date. Only what goes down the production line. I expect more vin allocation this qtr
Doesn’t make sense to me at this stage. It did couple of weeks ago but not nowI wonder how many times vedaprime has said this throughout their Tesla tracking career
Maybe this quote needs to be displayed as a banner for everyone to see
TY, Enzo look great, wll try them.I’m going with Enzo. I have two mates who did their teslas through them and they did a great job.
Going to get ceramic and the front window covered.
I am quite well versed in the things you bring up. What you are seeing is the production planning while Q4 was going on, based on Q3 numbers and what they know at the time mid November. The don't build in strictly vin number order. They have a planned scheduled, build them, then allocate, not build to order. I expect more vins to be allocated this quarter. We also know there are more orders than they are cars.Doesn’t make sense to me at this stage. It did couple of weeks ago but not now
1. How Tesla plans the production output based on different specs ordered
2. I can’t believe VINs are assigned spontaneously as it can cause the situation when no cars left for the earlier orders
3. There are two ships going now. The one is already in the port and cars are going to be distributed starting tomorrow. This should be based on the VINs I suppose?
The question is - are the cars in the Morning Crystal are still to be allocated for the ones who still has not got their VINs? Or our cars are still to be produced? But again there are only few days left before all production starts for the China market
Tesla really needs to do something and match production process to their cars experience. I placed my order almost three months ago and expect some certainty at this point.
Yes, English is not my first language but hopefully I made my point clear
I wonder about this too. If VINs are assigned randomly and there are more orders than cars, isn’t it possible that any order at any time may go unfilled? For example we know of people in November waiting for a VIN while someone in January has one.2. I can’t believe VINs are assigned spontaneously as it can cause the situation when no cars left for the earlier orders