So, I've been waiting for almost 4 months after my 7kW solar system with 2 powerwalls were installed and was wondering what the average PTO wait time was from PG&E. The Telsa Rep told me within 4-5 weeks since submitting the request.
Is there anyone I can contact to find out the status of the PTO from PG&E?
After 2 failed city inspections and lots of back and forth with Tesla to make sure it passed, the system finally passed inspections about 8 weeks ago. After that I had to call/email Tesla several times to get any updates on submitting the PTO but it took another 5 weeks before they submitted the PTO to PG&E (apparently the guy handling the paperwork was on vacation or in training, depending on who I talked to). So my experience has been very poor and it seems I have to call Tesla to get any updates or news.
Is there anyone I can contact to find out the status of the PTO from PG&E?
After 2 failed city inspections and lots of back and forth with Tesla to make sure it passed, the system finally passed inspections about 8 weeks ago. After that I had to call/email Tesla several times to get any updates on submitting the PTO but it took another 5 weeks before they submitted the PTO to PG&E (apparently the guy handling the paperwork was on vacation or in training, depending on who I talked to). So my experience has been very poor and it seems I have to call Tesla to get any updates or news.