Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Launch is Imminent

This site may earn commission on affiliate links.
We took delivery of a 2023 MY AWD, with 4680 structural pack, straight from the Austin factory in May, 2023…….
Yes, you took delivery of a MY AWD using first generation 4680 cells from the first production line at Gigatexas. The second 4680 production line at Gigatexas is building 2nd generation "Cybercell" cells and packs, which have about a 9% density increase over the 1st gen cells. The 1st production line is currently being updated to produce 2nd gen Cybercells - which is why Tesla stopped using 4680 cells in the base MY AWD back in September - to update the 1st generation line to produce 2nd generation Cybercells. The entirety of 4680 cells/packs currently being produced are being allocated for the CT ramp according to reliable sources. Eventually a 3rd/4th 4680 production line will be built and brought online in H2 2024 - that will complete Phase 1. Phase 2 for the 4680 production ramp is lines 4-8, which will be under construction in H2 2024 and brought online either late 2024 or likely sometime in H1 2025.
 
Which one is mine?

Come on Telsa - let me configure my 2.6 0-60 beast.

1703277636965.png



or maybe mine is over here.

1703277804729.png
 
Yes, you took delivery of a MY AWD using first generation 4680 cells from the first production line at Gigatexas. The second 4680 production line at Gigatexas is building 2nd generation "Cybercell" cells and packs, which have about a 9% density increase over the 1st gen cells. The 1st production line is currently being updated to produce 2nd gen Cybercells - which is why Tesla stopped using 4680 cells in the base MY AWD back in September - to update the 1st generation line to produce 2nd generation Cybercells. The entirety of 4680 cells/packs currently being produced are being allocated for the CT ramp according to reliable sources. Eventually a 3rd/4th 4680 production line will be built and brought online in H2 2024 - that will complete Phase 1. Phase 2 for the 4680 production ramp is lines 4-8, which will be under construction in H2 2024 and brought online either late 2024 or likely sometime in H1 2025.
Yes, I posted all of this detail yesterday (smile).
 
  • Like
Reactions: HitchHiker71