You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I'm sure the day after they deliver mine.When does model x switch to the next model year typically?
I'm sure the day after they deliver mine.
But in all seriousness, I believe at the end of the year
I believe new model years for Tesla begin in November usually.
I think it has to be built after the switch over date unfortunately. So I think your original statement will hold try. Same here honestly.
You are way better than my EDD of 11Sep-23Oct EDD in Las Vegas. OD 7/4/21. MSM 6 seat No FSD/EAP.Ordered 10/21/21. EDD last week changed to a range from 8/8/22 to 8/24/22. A couple days ago got pushed to a range of 8/24/22 to 9/28/22. MX, all base except 6 seater. In NV.
Certainly I understand that. The fact that someone has been waiting since a year ago January for a MXLR and hasn’t gotten their car is ridiculous.MXP's get to jump the line, that's been well established
your EDD looks like out or range 8/25 - 8/39 !!?VINNER!!!!! NF3569xx EDD 8/25- 8/39....Just praying the VIN doesn't disappear now. So close!
Couldn’t agree more. That’s Tesla for youCertainly I understand that. The fact that someone has been waiting since a year ago January for a MXLR and hasn’t gotten their car is ridiculous.
Towing thing.
"Originally placed MXLR 22/FSD/W/W on May 25, 2021. It was taking too long so I placed another order for same config for a Plaid on April 17, 2022. I wanted to see which one will be ready first and also my wife could take the MXLR if anything. Got a VIN for the Plaid 2wks ago and picking it up on 8/15. Got a VIN for the MXLR yesterday"I wonder if a VIN can be transferred to a different order
Don’t feel bad, Tesla can’t figure it out eitherCan't figure out how they schedule their production.
Maybe some of the magical delivery speed pixie dust of the Plaid rubbed off on the MXLR order"Originally placed MXLR 22/FSD/W/W on May 25, 2021. It was taking too long so I placed another order for same config for a Plaid on April 17, 2022. I wanted to see which one will be ready first and also my wife could take the MXLR if anything. Got a VIN for the Plaid 2wks ago and picking it up on 8/15. Got a VIN for the MXLR yesterday"
This is baffling.
I ordered similar configuration 3 months earlier (Feb 2021) and my EDD is still late October to late December. Can't figure out how they schedule their production.
That is the Tow hitch receiver. It is installed in the rear off the car when you want to tow a trailer. it normally comes in a black Tesla zipper bag long with a set of keys needed to install it. It is covered in grease and is pretty messy when first removing from its plastic wrap. Which apparently is also missing. If you do not have the keys for it, it is useless and will need to be replaced. Very odd that yours was loose in the frunk.