Hello, after 5 weeks of constantly bugging Tesla, they have finally sent me the design
I'm located in SoCal and with SCE, I ordered a 8.5kW + 1 PW. I was expecting that they will provide ore detailed design with location of PW ,wiring and conduit placement. They didn't mention if I need to upgrade my main panel (100 Amp), But all I got is this diagram with front of the house labeled incorrectly. Am I'm supposed to get more detailed design at permit stage?
It seems to me this is the best solar panel placement on my roof due to the rooftop ac and vents. Do you think it's worthwhile ($ Wise) to ask them to add another panel to the North roof? Or ask them to max out my roof? My annual usage is 7560 kwh, Tesla estimated the 20 panels would generate 12,737 kwh annually. I hope I can be self power throughout the day with the 1 power wall.
Thanks.
I'm located in SoCal and with SCE, I ordered a 8.5kW + 1 PW. I was expecting that they will provide ore detailed design with location of PW ,wiring and conduit placement. They didn't mention if I need to upgrade my main panel (100 Amp), But all I got is this diagram with front of the house labeled incorrectly. Am I'm supposed to get more detailed design at permit stage?
It seems to me this is the best solar panel placement on my roof due to the rooftop ac and vents. Do you think it's worthwhile ($ Wise) to ask them to add another panel to the North roof? Or ask them to max out my roof? My annual usage is 7560 kwh, Tesla estimated the 20 panels would generate 12,737 kwh annually. I hope I can be self power throughout the day with the 1 power wall.
Thanks.