Hope some people can help me.
Ive had a company in Essex fit a 6kw solar array, tesla powerwall 2 and gateway onto my house.
I've had all the pack come through, mcs certs etc but no DNO auth.
I've been chasing them since May for the dno but they're saying it can take months and they're chasing UK Power Networks. After reading about it looks like with this kind of install this should have been done prior before install?
Any help on where I stand and any issues that will arise would be appreciated.
I'm worried the installer are not being fully truthfull with me.
Ive had a company in Essex fit a 6kw solar array, tesla powerwall 2 and gateway onto my house.
I've had all the pack come through, mcs certs etc but no DNO auth.
I've been chasing them since May for the dno but they're saying it can take months and they're chasing UK Power Networks. After reading about it looks like with this kind of install this should have been done prior before install?
Any help on where I stand and any issues that will arise would be appreciated.
I'm worried the installer are not being fully truthfull with me.