You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
My EDD pushed back too from July 22nd to July 26 but window got smaller from 4 weeks to 2 weeks. this seems likely that car will deliver within that time frame.
OD - Oct 23
Red/18"wheels/black int.
I have yMy EDD pushed back too from July 22nd to July 26 but window got smaller from 4 weeks to 2 weeks. this seems likely that car will deliver within that time frame.
OD - Oct 23
Red/18"wheels/black int.
Congratulations on the order and welcome to THE wait!We just ordered a Model 3/silver/18" wheels/black int !!!! EDD 10/22-2/23, Let the LONG wait begin!! When should I start to see progress. November?
I'm glad to see that I'm not the only one! After they cancelled my VIN and delivery on 24 June my EDD went back to June 2022, and now TBD. My SA said I might get a VIN in the last days of July, but I'm not holding my breath.My EDD changed today from "June 2022" to TBD - Deliver timing will be available soon. It has been "June 2022" for a couple of months now,
OD: October 10, 2021 M3/RWD/White/White/Aero/No FSD
depending on your configuration if you have any upgrades. if your is the basic with no upgraded options, I would say it might be even further. Not trying to discourage you but it would be very wonderful to have a car within 6 mos after OD.My EDD is Nov-Dec but the more I read.. most likely is Jan-Dec 2023 lol
M3RWD - MSM/Black/Aero.depending on your configuration if you have any upgrades. if your is the basic with no upgraded options, I would say it might be even further. Not trying to discourage you but it would be very wonderful to have a car within 6 mos after OD.
The upgrade stuff doesn't change a whole bunch at all. The biggest punch to the EDD is upgrading to either LR or P. Demand for Tesla is huge and there are other car manufacturers that closed their doors on new orders for EVs because of the immense demand, while Tesla still has theirs open somehow. I went through the frenzy of upgrading from SR to LR to P and ended with the P in less than two months (though granted, it was refused by someone and was given to me).depending on your configuration if you have any upgrades. if your is the basic with no upgraded options, I would say it might be even further. Not trying to discourage you but it would be very wonderful to have a car within 6 mos after OD.
I have the exact same config. Details in my sigM3RWD - MSM/Black/Aero.
Yeah, the P will get you faster delivery.The upgrade stuff doesn't change a whole bunch at all. The biggest punch to the EDD is upgrading to either LR or P. Demand for Tesla is huge and there are other car manufacturers that closed their doors on new orders for EVs because of the immense demand, while Tesla still has theirs open somehow. I went through the frenzy of upgrading from SR to LR to P and ended with the P in less than two months (though granted, it was refused by someone and was given to me).
Of course it will, it's zero to sixty guarantees it!!!!Yeah, the P will get you faster delivery.