etheric_jerry
Member
Landscaping in, new lines painted for the stalls and some trees planted to dress up the lot.no meter as of Sun afternoon .........................
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
The information I got from AGW this morning (before he was leaving outside of the states) was he stopped by earlier today also, and spoke to the Electrical Foreman, as well as Brad, from Tesla who was doing the testing (with the generator). AGW said they did pass the town inspections, and now we are just waiting on PSE&G to install the electrical meter. He said that was scheduled for next Tuesday. Hopefully they might come sooner.
He also said the pairs of the pedestals MIGHT be mixed up (2 sets are paired A's (and then B's) together, and the other 4 are A&B and A&B).
Great, thanks for the update. Its a shame that the meter is going to hold it up for one more week...
With PSE&G they will be lucky if it only takes another week to get the meter installed.
If all that is left to do is install the meter, you would think that the utility would want that to happen soon to start the revenue stream...
AGW said they did pass the town inspections, and now we are just waiting on PSE&G to install the electrical meter. He said that was scheduled for next Tuesday. Hopefully they might come sooner.
As of Tue 8/19 evening everything appears to ready: The meter is installed, the stations are all fully assembled, and even the transformer is humming. However the stations have the plugs tied down with yellow CAUTION ribbons and the entrance is blocked with orange construction posts.
View attachment 57050
Why yes that is my beautiful S85 in the background!
~K
- - - Updated - - -
View from inside the charger area. Notwithstanding the politics of Edison, the partitions around the electrical equipment do look quite a bit better than the usual wooden ones!
View attachment 57051
Sign in page! - www.teslamotors.com/supercharger/edison
Wouldn't be surprised if it was operational.
PATIENCE!!!!!!!!!!!!!!!!!!!! Good things come to those who wait........................ A few"TAPS" must be made for the system to be up and running plus you got to test the system out to see if all is right, funny thing is that same spot where the chargers are once had a BAMBERGERS SERVICE CENTER there in the 60's thru 80's where Car repairs were done .......................anybody remember BAMBERGER"S STORES?? It became Macy's and still at that same location ......................and the shot of the trucks above shows how close the station is to the McDonalds on Rte 1 .
Usually when the page redirects to the Sign-In page, it is in fact operational but not officially open. I've seen the same thing happen for MANY other locations.
Tesla is editing the page now, I get "acces denied"
So any time now I think