Supercharger - Fremont, CA - 39201 Fremont Blvd (Fremont Hub, LIVE 27 Apr 2018, 12 V2 stalls)

This site may earn commission on affiliate links.
Pictures from today. Transformer installed, light poles not, yellow tape still.
20171220_145220.jpg
20171220_145231.jpg
20171220_145233.jpg
20171220_145222.jpg
20171220_145238.jpg
 
  • Like
Reactions: Ulmo and DOCAL
I went by there Thursday and nothing has changed as far as I could tell. Lamp posts still laying on the ground. There was a PG&E truck but didn't see the worker.

I also stopped by briefly around 2 pm Thursday afternoon and noticed the two light poles were still on the ground, Tape still on the charging pedestals, and the PG&E truck was not next to the superchargers, but way over near the back end of target in the electrical underground area. Must be having difficulty getting power out to that remote part of the parking lot, as there were no visible trenches seen during construction.
 
The electricians are out today again in the rain. Look like a big push to get these operational soon. I talked with the crew, and they said they are not allowed to talk about what they are doing. But most of the pedestals have charging cables installed. They were working in a pit on Saturday working with conduit near the transformers.
 