There is massive trenching and large cabinets still in packaging clearly visible from I5 south. There appears to be additional utility work across the street @ Jeffery and Walnut.
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Of course it will be busy. And of course it will be good to have these additional Superchargers compared to not having them. So I’m glad to see this new location under construction!From Day 1 of opening, this SpC will be packed.
Oh well, hopefully it relieves congestion elsewhere.
Confirmed super charger and not urban. And it will be at ranch 99. The Starbucks ones are css. Hopefully they are 250 V3 chargers. View attachment 592675
I believe that's a picture of the superchargers going in at 99 Ranch, but that is a different location. This thread is about a location one exit along the 5 north of there at Walnut & Culver in the shopping center with the Ralphs and CVS.Confirmed super charger and not urban. And it will be at ranch 99. The Starbucks ones are css. Hopefully they are 250 V3 chargers. View attachment 592675
This pic looks like Jeffery and Walnut location not Culver and Walnut as per this topic.
correct. I believe that was the one I was posting in. But mod moved it here. So confusing. But I guess not many cities have 4 locations...
A bit more progress today. Looks like the concrete is poured
I noticed these from the 5 Freeway. Always happy to see more SCs being built, but I have a feeling the lines are not going to be fun at this one given only 8 stalls.Took a quick peek today
Worse, the parking lot that one will have to drive through to get to these stalls is always super-busy. These will be difficult to access just because of local traffic.I noticed these from the 5 Freeway. Always happy to see more SCs being built, but I have a feeling the lines are not going to be fun at this one given only 8 stalls.