The strange thing is that the valley stream supercharger went online already and I recall watching progress on the southampton charger from construction to operation and it went pretty quickly as well.Minor update, with no change. Tesla and the local union seem to be in disagreement about something. I'm guessing it's price to install the transformer and connect to the grid. Islandia village hall cant get answers from either side, but 1049 says they are waiting on tesla to agree to terms. They are likely trying to megotiate terms, since they will be installing a fairly large number of chargers of the coming years.
Very sad. I hope they go on line soon. We are so close.I checked the Islandia, NY supercharger station again on 6-6-18; still not operational. No changes. The primary wires for the entire station are still coiled up on the utility pole and no meter. Sad.
Has the graffiti been cleaned up?As of yesterday 6/18 still looks same as in St50’s post. All ready and no meter. I agree with Ken. All should have been agreed upon up front. Had that been done, it would have gone live in May.