6-28-18 Update for the Islandia, NY SC; there was an electrical utility crew on site today. They connected the primary wires at the pole and landed the opposite ends inside one of the cabinets. The foreman told me that the "electrician still had to run their wires". He didn't know when that would be or when a meter might be installed or when Tesla would verify the installation. Frustrating.