I agree. This due to the Walmart primarily.I swung by here on my way home after dinner in Newark this evening - no change - the covers are still on the stalls.
The traffic getting out of the Wawa at 8:30pm was terrible.
Could you ask them again and maybe have it moved to the Mid-Atlantic section.Hey, I don’t moderate this section but have reported it to the appropriate mod.
And the name. Any possible moderators @ecarfan @TEG @Doug_G pls?Could you ask them again and maybe have it moved to the Mid-Atlantic section.
I swung by here on my way home after dinner in Newark this evening - no change - the covers are still on the stalls.
The traffic getting out of the Wawa at 8:30pm was terrible.
There's another exit. Make right instead of left when coming out of WAWA. and then right again onto the road leading to Harrison Ave.I agree. This due to the Walmart primarily.
Thanks. Yes, I had a look at the map after I was there and see that this is possible.There's another exit. Make right instead of left when coming out of WAWA. and then right again onto the road leading to Harrison Ave.
Drive by on 12/5/18. Looks like all work has been completed, 8 units covered with "Coming Soon" wraps. 8 stalls in an odd pattern, 4 and 4 at the back of the lot near the gas pumps, 2 are head in units. Signs say 10 minute general parking but the chargers are pretty far from Wawa entrance.
View attachment 358346
They have been covered like this for almost 2 months now. I wish I knew what they ate waiting for.Drive by on 12/5/18. Looks like all work has been completed, 8 units covered with "Coming Soon" wraps. 8 stalls in an odd pattern, 4 and 4 at the back of the lot near the gas pumps, 2 are head in units. Signs say 10 minute general parking but the chargers are pretty far from Wawa entrance.
View attachment 358346
I’m not an expert but I don’t think there’s a transformer yet. There seems to be about 4 conduits coming out of the ground that aren’t connected to anything.Do you see a power transformer. That is usually the delay. Getting the feeder from the power company and the transformer. I don't see any pictures showing it (out of frame of what is shown)
varies greatly, from week to months, which turf is Harrison (power company)?
Hopefully not like other examples of PSEGs work but it could be. Jersey City took 4 months waiting on PSEG. North Brunswick took a long time too.How long is "a while"?
At the end of October, @navinsiri took a picture which showed that the utility transformer hadn't been installed yet (see post #14 in this thread). It sounds like that hasn't changed. I've highlighted the picture to show where the transformer will go and you can see the conduit stubs sticking up through the concrete pad. So, until that gets installed don't expect any progress. As for what is taking so long to get it installed, it could be a number of things and not all of them contingent on the local power company's scheduling. These transformers are large, expensive hardware with long lead times (i.e. you may have to order/buy them 6-8 months before they are delivered).They have been covered like this for almost 2 months now. I wish I knew what they ate waiting for.